Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Clarification on drugs and Alcohol testing for safety-critical workers
This technical note aims to provide a greater understanding of the importance of drugs and alcohol testing for safety-critical workers by providing…
Managing Low Adhesion
This standard sets out a framework to develop, implement, monitor and review the effectiveness of site-specific plans to manage low adhesion at…
Lineside Signal and Indicator Product Design and Assessment Requirements
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
GKRT0057 Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Rail Industry Standard for Driving Cabs
This document sets out supplementary requirements for the design, layout and operational equipment in driving cabs of rail vehicles to the Locomotive…
RIS-2761-RST Iss 1.1
June 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Application of the WAG NTSN and NOI NTSN to the Design of Freight Wagons
This document provides guidance on the application of the Rolling Stock - Freight Wagon National Technical Specification Notice (WAG NTSN) and on the…
GMGN2688 Iss 2
June 2024
Withdrawn
- Briefing Notes: 1
- Amendments: 3
- Technical Notes 2
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Provision of Signage at Power Changeover Locations
This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.
RIS-3784-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Maintaining the Visibility of Signals and Operational Signs
This document sets out requirements and guidance to ensure that the visibility of signals and operational signs are not adversely affected during the…
RIS-8034-CCS Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Medical Fitness Assessment
This document sets out requirements and guidance for the management of medical fitness assessment for safety critical workers on the GB mainline…
GOGN3655 Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
RIS-3451-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-3452-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Lineside Operational Signs
This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB catalogue. It also…
RIS-0733-CCS Iss 1.2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Determination of Aerodynamic Rolling Moment Coefficient
This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…
GMRC2542 Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Amendments: 1
Reference Limits for Freight Wagon Defects
This document sets out the criteria for addressing defects in freight wagons arising during operation, and the restrictions on their use that apply.
RIS-2702-RST Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Requirements for the operation of freight trains and the conveyance of dangerous goods by any train
This document sets out requirements and guidance relating to the safe operation of freight trains and the safe movement of dangerous goods.
RIS-3781-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
IWA or COSS setting up safe systems of work within possessions on ERTMS lines where lineside signals are not provided
You will need this handbook if you are an IWA or COSS setting up safe systems of work within ERTMS possessions. This document has been updated as part…
GERT8000-HB9 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 1
Instructions for track workers who use emergency protection equipment
This handbook is for those personnel who need to go on the operational railway to carry out their duties, and have been trained to carry out emergency…
GERT8000-HB2 Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Duties of the person in charge of the possession (PICOP) on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the person in charge of the possession (PICOP) on ERTMS lines. This document has been…
GERT8000-HB11 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Engineering Supervisor's Certificate
Engineering supervisor's certificate for use on ERTMS level 2 without lineside signals routes.
Duties of a level crossing attendant
You will need this handbook if you carry out the duties of a level crossing attendant. This document has be updated as part of the December 2015 Rule…
GERT8000-HB18 Iss 3
December 2015
Withdrawn
- Impact Assessments 1
Proceed-on-Sight Authority (PoSA)
You will need this module if your duties require you to identify and understand the meaning of PoSA signals. This document has be updated as part of…
Trains or shunting movements detained on running lines
You will need this module if you carry out the duties of a driver, shunter or signaller.
GERT8000-S4 Iss 4
December 2015
Withdrawn
- Impact Assessments 2
Possession arrangements form (T3 ERTMS)
Possession arrangements form (T3 ERTMS) for use on ERTMS level 2 without lineside signals routes.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Code of Practice for Plant Modules on Rail Wagons and Trailers
This Code of Practice identifies the process to be undertaken when plant modules are attached to rail wagons or trailers. This covers the use of plant…
COP0035 Iss 2
September 2024
Withdrawn
Code of Practice for the Storage and Recommissioning of OTP
This Code of Practice is to define the actions that should be taken for any OTP designated as Out of Service recommending a minimum level of…
Code of Practice for OTM Driver Communication Review Group (CRG)
This Code of Practice supports the national strategy for improved Safety Critical Communications. It provides a collaborative process (M&EE Group OTM…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…