Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Route Level Assessment of Technical Compatibility between Rail Vehicles and Underline Bridges
This document sets out requirements and guidance for the assessment of compatibility between rail vehicles and underline bridges at route level on the…
RIS-8706-INS Iss 1
June 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance on evaluating excessive dynamic effects in underline bridges
This document provides guidance on evaluating and managing the risk of excessive dynamic effects in underline bridges resulting from the operating…
Fire safety of refurbished passenger seats
This technical note provides guidance on the application of fire standards to existing vehicles undergoing refurbishment which affects passenger…
Public address interface to GSM-R
This technical note will help industry to determine GSM-R cab radio public address announcement priorities when integrated with the onboard public…
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
On-Train Camera Monitoring Systems
This document sets out requirements for the installation and use of modern camera systems for the purposes of recording, storing, and accessing video…
RIS-2712-RST Iss 1.1
March 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Guidance on the Application of the Control of Electromagnetic Fields at Work Regulations
This document gives guidance on the application of the Control of Electromagnetic Fields at Work Regulations in the railway environment, and…
GLGN1620 Iss 1
March 2024
Withdrawn
- Briefing Notes: 1
Infrastructure Based Train Detection Interface Requirements
This standard specifies the infrastructure based train detection system parameters that are necessary to support technical compatibility with GB…
GKRT0028 Iss 3.1
March 2024
Withdrawn
- Briefing Notes: 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Guidance on the Operation and Traffic Management Technical Specification for Interoperability
This document provides guidance on interpretation of points within the Operation and Traffic Management TSI (OPE TSI) where, owing to incomplete or…
GOGN3615 Iss 1
September 2017
Withdrawn
- Briefing Notes: 2
Identification of Signalling and Related Equipment
This document sets out the principles for ensuring that signalling and related assets are uniquely identified.
GKGN0609 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GKRT0009 Iss 4
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Tilting Trains: Controlling Tilt Systems to Maintain Clearances
This document sets out the means by which Tilting Trains are permitted to utilise the tilt mechanism over routes, parts of which contain sections…
GERC8517 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GERT8019 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
Controlling the Speed of Tilting Trains through Curves
This document sets out the means by which tilting trains may be operated at higher speeds than non-tilting trains around curves.
GERC8517 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GERT8012 Iss 1
December 2017
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
- Deviations 2
Engineering Requirements for Dispatch of Trains from Platforms
This document sets out the minimum engineering requirements for the facilities used in dispatching trains from platforms.
GERT8060 Iss 2
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
GEGN8560 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
Low Voltage Power Supplies in Electrified Areas
This document includes requirements for earthing, bonding and the control of traction currents in low voltage power supplies in areas of the GB…
GLRT1255 Iss 1
June 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
ERTMS Key Management
This document contains requirements for the management of cryptographic keys on the mainline railway to facilitate secure European Rail Traffic…
GEGN8603 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Guidance on the Energy TSI
This document gives guidance on interpreting the requirements of the Energy Technical Specification for Interoperability 2014 (ENE TSI) Commission…
GEGN8600 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Amendments: 1
GSM-R Train Voice Radio Systems
This document sets out the requirements for the application of GSM-R train voice radio systems, specifically interface requirements for the…
RIS-0794-CCS Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
GKRT0094 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
GKGN0694 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Electric token block regulations
You will need this module if you carry out the duties of a signaller in an electric token block area.
Tokenless block regulations
You will need this module if you carry out the duties of a signaller in a tokenless block area.
No-signaller token regulations
You will need this module if you carry out the duties of a signaller in a no-signaller token area. You will also need module TS8 One-train working…
One-train working regulations
You will need this module if you carry out the duties of a signaller in a one-train working area, whether or not a train staff is provided, and a…
General safety responsibilities and personal track safety for non-trackworkers
You will need this module if you carry out the duties of: • a train driver • a guard • a shunter • a designated person (DP) • a signaller • a crossing…
GERT8000-G1 Iss 9
December 2022
Withdrawn
- Impact Assessments 1
Absolute block regulations
You will need this module if you carry out the duties of a signaller in an absolute block area.
GERT8000-TS3 Iss 7
December 2022
Withdrawn
- Impact Assessments 1
- Deviations 3
Possession of an ERTMS running line for engineering work where lineside signals are not provided
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 ERTMS Iss 4
December 2022
Withdrawn
- Impact Assessments 1
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.