Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Rolling stock – cyber security essentials
This technical note will help industry to identify cyber security control measures, which may be put in place when designing a new component or…
Driver-controlled operation and driver-only operation on-train camera monitoring systems
This technical note will help industry in the design and operation of on-train camera monitoring systems. It provides guidance on the applicable…
Signalling layout and signal aspect sequence requirements
This document sets out requirements for the lineside signalling system to be compatible with train operations and guidance on their application.
RIS-0703-CCS Iss 1.1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
- Amendments: 1
- Deviations 1
Preparation and working of freight trains
You will need this module if you carry out the duties of the following in relation to freight trains: train driver, guard, shunter, train preparer.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Storage and Recommissioning of Rail Vehicles
This document sets out guidance on the storage and recommissioning of rail vehicles that are not to be operated on the GB mainline railway for an…
GMGN2571 Iss 1
June 2022
Withdrawn
- Briefing Notes: 1
GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.
GIRT7020 Iss 1.1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
Requirements for Driving Cabs of Railway Vehicles
This document sets out national technical rules for driving cabs of railway vehicles on visibility from within, emergency exit dimensions and…
GMRT2161 Iss 2
March 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Accident and Incident Investigation
This document sets out requirements and guidance for the investigation of adverse events involving more than one duty holder so that system…
RIS-3119-TOM Iss 2.2
March 2022
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Drugs and alcohol testing for safety-critical workers
This document provides transport operators with the industry-agreed standard for testing safety-critical workers for drugs and alcohol. It contains…
RIS-8070-TOM Iss 1
March 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GEGN8570 Iss 2
March 2022
Withdrawn
- Briefing Notes: 1
Provisional ERTMS SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the RT3119 designated Provisional SPAD Data Collection forms when investigating signals…
Form RT3119-D Iss 3
December 2021
Withdrawn
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Changes to National Operations Publications for March 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trainoperationsstaff Iss 14.1
November 2024
Live Pending Withdrawal
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 14.1
November 2024
Live Pending Withdrawal
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Code of Practice for Safety Critical Maintenance Elements of Small Plant and Equipment
This Code of Practice details the arrangement for, and safety critical work implications of, the maintenance of small plant and equipment. This has…
COP0010 Iss 2
December 2012
Withdrawn
Code of Practice for Audit Protocol for Supply of Machine / Crane Controllers
This Audit Protocol provides a comprehensive list of questions for an auditor to ask and detailed guidance of what is expected of an auditor whilst…