Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Driver-controlled operation and driver-only operation on-train camera monitoring systems
This technical note will help industry in the design and operation of on-train camera monitoring systems. It provides guidance on the applicable…
Signalling layout and signal aspect sequence requirements
This document sets out requirements for the lineside signalling system to be compatible with train operations and guidance on their application.
RIS-0703-CCS Iss 1.1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
- Amendments: 1
- Deviations 1
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
Preparation and working of freight trains
You will need this module if you carry out the duties of the following in relation to freight trains: train driver, guard, shunter, train preparer.
Station duties and train dispatch
You will need this module if you carry out the duties of a driver, a guard, a person in charge (PIC) of dispatch or staff responsible for train…
Observing and obeying signalling indications. Train warning systems. Reporting signalling failures and irregularities
You will need this module if you carry out the duties of a driver, person controlling train movements, shunter or signaller.
GERT8000-S7 Iss 5
December 2023
Withdrawn
- Impact Assessments 1
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 6
December 2023
Withdrawn
- Impact Assessments 1
Duties of the COSS and person in charge when using a hand trolley
You will need this handbook if you are the COSS or SWL and person in charge when using a hand trolley.
GERT8000-HB10 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Managing Train Accident Risk Arising from Train Operations
This document sets out requirements and guidance for the management of train accident risk arising from train operations as part of the GB rail…
RIS-3704-TOM Iss 1
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Requirements for the Position of Infrastructure and for Defining and Maintaining Clearances
This document sets out requirements for positioning infrastructure and maintaining the position of track relative to infrastructure to achieve gauge…
GIRT7073 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 10
Railway Wheelsets
This document sets out requirements for the design, manufacture and maintenance of wheelsets and their components. Access the tread profile…
Rail Industry Standard for Wheelsets
This document supports GMRT2466 and sets out requirements for the design, manufacture and maintenance of wheelsets and their components.
RIS-2766-RST Iss 1
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Corrosion of rail vehicles
This technical note will help those maintaining or repairing rolling stock in detecting, and if appropriate, remedying corrosion. It covers current…
ERTMS National Identities Management
This document sets out the requirements for arrangements for the management of the ERTMS National Identities on the GB mainline railway.
GERT8072 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements and guidance for new, renewed and upgraded ac energy subsystem, and the interfaces to rolling stock and operation…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements and guidance for the alternating current (ac) energy subsystem for all rolling stock operating over…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements for the alternating current (ac) energy subsystem and the interfaces to rolling stock operating over the ac…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements to the alternating current (ac) energy subsystem for all rolling stock operating over the Great Britain…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.