Menu
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:

Live
Issue Date: September 2023

Station duties and train dispatch

You will need this module if you carry out the duties of a driver, a guard, a person in charge (PIC) of dispatch or staff responsible for train…

Station duties and train dispatch
GERT8000-SS1 Iss 8
December 2023
Withdrawn
  • Impact Assessments 1
Live
Issue Date: September 2023

Activation of TPWS or ERTMS tri

This form is used by a signaller to record information obtained from drivers after the activation of TPWS, except when a signal has been passed at…

Live
Issue Date: September 2023

Duties of the COSS and person in charge when using a hand trolley

You will need this handbook if you are the COSS or SWL and person in charge when using a hand trolley.

Duties of the COSS or SWL and person in charge when using a hand trolley
GERT8000-HB10 Iss 4.1
December 2023
Withdrawn
  • Impact Assessments 1
Live
Issue Date: September 2023

Glossary of Railway Terminology

You will need this glossary if you are issued with GERT8000.

Glossary of Railway Terminology
GERT8000-Gloss Iss 6
December 2023
Withdrawn
  • Impact Assessments 1
Live
Issue Date: September 2023

Engineering Requirements for Steam Locomotives and other Heritage Rail Vehicles

This document sets out the engineering requirements for heritage rail vehicles (including steam locomotives) to support use when operating in heritage…

Engineering Requirements for Steam Locomotives and other Heritage Rail Vehicles
RIS-4472-RST Iss 1
September 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: September 2023

Management of Control Command and Signalling (CCS) Subsystem Failures, Faults and Defects

This document sets out the management process requirements that apply to safety related failures of control command and signalling (CCS) onboard and…

Management of Safety Related Control, Command and Signalling System Failures
RIS-0707-CCS Iss 1
September 2023
Withdrawn
  • Briefing Notes: 1
  • Technical Notes 1
Live
Issue Date: September 2023

Track to Train RFID Compatibility

This document sets out requirements for RFID compatibility between train and track, including management of application codes.  

Track to Train RFID Compatibility
RIS-2795-RST Iss 2.2
September 2023
Withdrawn
  • Briefing Notes: 1
Live
Issue Date: September 2023

Operational Requirements for GSM-R Radio

This document contains the necessary requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system.…

Operational Requirements for GSM-R Radio
RIS-3780-TOM Iss 1
September 2023
Withdrawn
  • Impact Assessments 1
Live
Issue Date: September 2023

Reporting a signal / AWS / TPWS / ATP / TVM failure or irregularity

For use by drivers in all cases of signal, AWS or TPWS irregularities and signallers when the following is reported: A wrong side signalling failure,…

Reporting a signal / AWS / TPWS / ATP / TVM failure or irregularity
Form RT3185 Iss 12-15
December 2023
Withdrawn
Live
Issue Date: September 2023

Advice to Train Crews - Conveyance of Radioactive Flask

This form is a Network Rail maintained document and is provided as a stand-alone version of the form originally reproduced as an Appendix to GORT3407…

Advice to Train Crews - Conveyance of Radioactive Flask
Form RT3973-NUC Iss 1
December 2023
Withdrawn
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: December 2022

ERTMS National Identities Management

This document sets out the requirements for arrangements for the management of the ERTMS National Identities on the GB mainline railway.

ERTMS National Identities Management
GERT8072 Iss 1
March 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 2
  • Amendments: 1
Live
Issue Date: December 2022

AC Energy Subsystem and Interfaces to Rolling Stock Subsystem

This document sets out requirements and guidance for new, renewed and upgraded ac energy subsystem, and the interfaces to rolling stock and operation…

AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
GLRT1210 Iss 2
March 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 52
Guidance on AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
GLGN1610 Iss 2
March 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 2
Live
Issue Date: December 2022

Rolling Stock Subsystem and Interfaces to AC Energy Subsystem

This document sets out interface requirements and guidance for the alternating current (ac) energy subsystem for all rolling stock operating over…

Rolling Stock Subsystem and Interface to AC Energy Subsystem
GMRT2111 Iss 2
March 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 3
Guidance on Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
GMGN2611 Iss 2
March 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 2
Live
Issue Date: December 2022

Application of Standard Vehicle Gauges

This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.

Application of Standard Vehicle Gauges
GERT8073 Iss 4
December 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 1
Live
Issue Date: December 2022

AC Energy Subsystem and Interfaces to Rolling Stock Subsystem

This document sets out requirements for the alternating current (ac) energy subsystem and the interfaces to rolling stock operating over the ac…

AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
GLRT1210 Iss 2
March 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 52
Guidance on AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
GLGN1610 Iss 2
March 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 2
Live
Issue Date: December 2022

Rolling Stock Subsystem and Interfaces to AC Energy Subsystem

This document sets out interface requirements to the alternating current (ac) energy subsystem for all rolling stock operating over the Great Britain…

Rolling Stock Subsystem and Interface to AC Energy Subsystem
GMRT2111 Iss 2
March 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 3
Guidance on Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
GMGN2611 Iss 2
March 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 2
Live
Issue Date: November 2022

Train front-end visibility requirements and safe integration

This technical note clarifies the application of standards and legislation for front-end visibility and safe integration of rolling stock within the…

Live
Issue Date: September 2022

Process for Adding, Removing or Modifying Lettered Differential Permissible Speeds

This document sets out requirements and guidance to support the process of adding, removing or modifying a Lettered Differential Permissible Speed…

Live
Issue Date: September 2022

Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure

This document sets out requirements and responsibilities for the assessment of technical compatibility at route level for vehicles and infrastructure.

Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure
RIS-8270-RST Iss 1
September 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2025

Rule Book Module Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000).

Rule Book Module Issue History
GERT8000 Issue Iss 37
September 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Rule Book Briefing Leaflet

Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.

Rule Book Briefing Leaflet
GERT8000-RBBL Iss 40.1
November 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Changes to National Operations Publications for March 2025

This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…

Live
Issue Date: March 2025

AC Electrified Lines

You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…

AC Electrified Lines
GERT8000-AC Iss 7
December 2021
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2025

AC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…

AC electrified lines
GERT8000-HB16 Iss 5
December 2021
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2025

Rule Book Handbook Issue History

This document contains updates to align with changes to Rule Book handbook issues (GERT8000).

Rule Book Handbook Issue History
GERT8000 Issue HB Iss 18
September 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

DC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…

DC electrified lines
GERT8000-HB17 Iss 4
December 2021
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2025

DC Electrified Lines

You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…

DC Electrified Lines
GERT8000-DC Iss 5
December 2021
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2025

Train Operations Staff Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Operations Staff Manual
GERM8000-trainoperationsstaff Iss 14.1
November 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Master Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Master Manual
GERM8000-master-module Iss 14.1
November 2024
Live Pending Withdrawal
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2025

Lower pantograph (temporary power changeover)

This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).  

Live
Issue Date: March 2025

Warning of Traction System Changeover

This document provides design details for sign AJ04 - Warning of traction system changeover.  

Warning of traction system changeover
Sign AJ04 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Changeover to or from self-powered

This document provides design details for sign AJ08 - Changeover to or from self-powered.

Live
Issue Date: March 2025

Directional arrows

This document provides design details for sign AJ10 - Directional arrows.  

Live
Issue Date: March 2025

Advance lower pantograph (temporary power changeover)

This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).

Live
Issue Date: March 2025

Changeover to Overhead Electric Traction

This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.

Live
Issue Date: March 2025

Do not raise pantograph

This document provides design details for sign AJ09 - Do not raise pantograph.  

Live
Issue Date: March 2025

Lower Pantograph

This document provides design details for sign AJ03 - Lower pantograph

Lower pantograph
Sign AJ03 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Indication of route

This document provides design details for sign AJ11 - Indication of route.

Live
Issue Date: March 2025

Do not raise pantograph (temporary power changeover)

This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: July 2024

Code of Practice for Plant Modules on Rail Wagons and Trailers

This Code of Practice identifies the process to be undertaken when plant modules are attached to rail wagons or trailers. This covers the use of plant…

Live
Issue Date: July 2024

Code of Practice for the Storage and Recommissioning of OTP

This Code of Practice is to define the actions that should be taken for any OTP designated as Out of Service recommending a minimum level of…

Live
Issue Date: March 2024

Code of Practice for OTM Driver Communication Review Group (CRG)

This Code of Practice supports the national strategy for improved Safety Critical Communications.  It provides a collaborative process (M&EE Group OTM…

Live
Issue Date: January 2024

Code of Practice for Plant Any Line Open (ALO) Working

This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.

Live
Issue Date: January 2024

Code of Practice for Haulage Capabilities of On Track Machines

This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…

Live
Issue Date: January 2024

Code of Practice for Action following Hydraulic Pump and/or Motor Failure

This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).

Live
Issue Date: January 2024

Code of Practice for OTM Ready to Run Card

This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…

Code of Practice for OTM Ready to Run Card
COP0041 Iss 1
March 2024
Withdrawn
Live
Issue Date: January 2024

Code of Practice for M&EE Documents

This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…

Code of Practice for M&EE Documents
COP0 Iss 5
March 2024
Withdrawn
Live
Issue Date: January 2024

Code of Practice for Hydraulic Hose In-use Repair

This Code of Practice details the action to be taken following the failure of  hydraulic hose(s) on an on-track machine (OTM).

Code of Practice for Hydraulic Hose In-use Repair
COP0043 Iss 2
March 2024
Withdrawn
Live
Issue Date: January 2024

Code of Practice for Safe Use of Remote Controls

This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…

Code of Practice for Safe Use of Remote Controls
COP0031 Iss 1
March 2024
Withdrawn