Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Work on signalling equipment – duties of the signalling technician
You will need this handbook if you carry out the duties of a signalling technician.
GERT8000-HB19 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Activation of TPWS or ERTMS tri
This form is used by a signaller to record information obtained from drivers after the activation of TPWS, except when a signal has been passed at…
Form RT3188 02-05
December 2023
Withdrawn
Signal Passed at Danger (SPAD) or Train Trip or Unauthorised Movement
For use by signallers in cases of a SPAD being investigated.
Form NR3189 Iss 1
December 2023
Withdrawn
- Impact Assessments 1
Management of Control Command and Signalling (CCS) Subsystem Failures, Faults and Defects
This document sets out the management process requirements that apply to safety related failures of control command and signalling (CCS) onboard and…
RIS-0707-CCS Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Technical Notes 1
Engineering Requirements for Steam Locomotives and other Heritage Rail Vehicles
This document sets out the engineering requirements for heritage rail vehicles (including steam locomotives) to support use when operating in heritage…
RIS-4472-RST Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Operational Requirements for GSM-R Radio
This document contains the necessary requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system.…
RIS-3780-TOM Iss 1
September 2023
Withdrawn
- Impact Assessments 1
Reporting a signal / AWS / TPWS / ATP / TVM failure or irregularity
For use by drivers in all cases of signal, AWS or TPWS irregularities and signallers when the following is reported: A wrong side signalling failure,…
Form RT3185 Iss 12-15
December 2023
Withdrawn
Advice to Train Crews - Conveyance of Radioactive Flask
This form is a Network Rail maintained document and is provided as a stand-alone version of the form originally reproduced as an Appendix to GORT3407…
Form RT3973-NUC Iss 1
December 2023
Withdrawn
Duties of the person in charge of the siding possession (PICOS)
You will need this handbook if you carry out the duties of a PICOS.
GERT8000-HB13 Iss 3
December 2023
Withdrawn
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Compatibility Requirements for Track Circuit Assisters (TCAs) on Rail Vehicles
This sets out Great Britain (GB) requirements on where TCAs shall be fitted onto a vehicle and how they shall be set up.
GMRT2477 Iss 2
September 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Functionality and Management of Track Circuit Assisters (TCAs) on Rail Vehicles
This document sets out requirements for the functionality, testing and management of failures of TCAs on rail vehicles.
Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls
This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops and End Impact Walls,…
GCRC5633 Iss 2
June 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GIGN7616 Iss 2
June 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
Rail Industry Standard for Station Infrastructure
This document has been published to provide a voluntary standard on station infrastructure, for infrastructure managers responsible for managing and…
RIS-7700-INS Iss 2
June 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.