Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Work on signalling equipment – duties of the signalling technician
You will need this handbook if you carry out the duties of a signalling technician.
GERT8000-HB19 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Activation of TPWS or ERTMS tri
This form is used by a signaller to record information obtained from drivers after the activation of TPWS, except when a signal has been passed at…
Form RT3188 02-05
December 2023
Withdrawn
Signal Passed at Danger (SPAD) or Train Trip or Unauthorised Movement
For use by signallers in cases of a SPAD being investigated.
Form NR3189 Iss 1
December 2023
Withdrawn
- Impact Assessments 1
Station duties and train dispatch
You will need this module if you carry out the duties of a driver, a guard, a person in charge (PIC) of dispatch or staff responsible for train…
Observing and obeying signalling indications. Train warning systems. Reporting signalling failures and irregularities
You will need this module if you carry out the duties of a driver, person controlling train movements, shunter or signaller.
GERT8000-S7 Iss 5
December 2023
Withdrawn
- Impact Assessments 1
Management of Control Command and Signalling (CCS) Subsystem Failures, Faults and Defects
This document sets out the management process requirements that apply to safety related failures of control command and signalling (CCS) onboard and…
RIS-0707-CCS Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Technical Notes 1
Engineering Requirements for Steam Locomotives and other Heritage Rail Vehicles
This document sets out the engineering requirements for heritage rail vehicles (including steam locomotives) to support use when operating in heritage…
RIS-4472-RST Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Operational Requirements for GSM-R Radio
This document contains the necessary requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system.…
RIS-3780-TOM Iss 1
September 2023
Withdrawn
- Impact Assessments 1
Reporting a signal / AWS / TPWS / ATP / TVM failure or irregularity
For use by drivers in all cases of signal, AWS or TPWS irregularities and signallers when the following is reported: A wrong side signalling failure,…
Form RT3185 Iss 12-15
December 2023
Withdrawn
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Traction batteries in rolling stock depots
The technical note aims to inform the industry on handling, storage and the safe maintenance practices of lithium-ion traction battery packs within…
Fire compartmentation and Li-ion traction batteries
The technical note aims to inform the industry on adequate design considerations for crashworthiness and fire barrier considerations to minimise the…
Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4.1
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Application of the Entity in Charge of Maintenance Regulations
This document gives guidance on the application of regulations on entities in charge of maintenance (ECM) with respect to freight wagons that are used…
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 4
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
Verification of Conformity of Engineering Change to Rail Vehicles
The document sets out a process for verification of conformity of engineering change against applicable requirements. This process can be adopted by…
RIS-2700-RST Iss 2
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Technical Notes 3
Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7.1
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).