From: To:Examination and repair of structural corrosion in Mark 1 type rolling stock
This technical note will help those maintaining or repairing Mark 1 type rolling stock to detect and remedy corrosion on this type of vehicle. This…
Axle Bearing Condition Monitoring
This document sets out requirements and guidance for condition monitoring of axle bearings, whether by trackside or onboard detection systems.
GEGN8614 Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
GERT8014 Iss 2
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Deviations 1
Movement of Continental Wagons on the GB Network
RIS-2770-RST Iss 1 sets out requirements and guidance around the process of registering and assessing compatibility of wagons not registered in GB for…
RIS-2770-RST Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Assessment of Passenger Seat Comfort
This document gives guidance on the assessment of static comfort for passenger seats on rolling stock. It includes criteria to measure aspects of a…
ERTMS/ETCS Baseline 3 Onboard Subsystem Requirements
This document sets out the industry agreed requirements and guidance for the Great Britain (GB) application of the ERTMS/ETCS Baseline 3 onboard…
RIS-0797-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-0798-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Reporting of adverse events
This technical note will help industry to understand the reporting systems for safety related issues provided by the Rail Safety and Standards Board…
Lineside Operational Signs - Product Requirements
This document sets of the requirements of lineside operational signs that support technical compatibility with rail vehicle exterior lighting and…
GIRT7033 Iss 4
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Rail Vehicle Structures and Passive Safety
This document sets out requirements for the design and integrity of primary and secondary rail vehicle structures, including interior crashworthiness.
GMRT2100 Iss 6.1
June 2023
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Management of Safety-Related Rail Vehicle Defects
This document defines requirements for recording, analysing and reporting safety-related defects, faults and failures on rail vehicles, plant and…
RIS-8250-RST Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
Urgent High-Risk Defect Report Form
In the event that the NIR-Online system is unavailable, details of urgent high-risk defects, faults and failures shall be shared by completing and…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Written Order 03 Instruction to Run At Caution Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Written Order 01 Permission To Start In SR Or To Pass An EOA Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Written Order 02 Permission to Proceed After Train Trip Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.