Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Corrosion of rail vehicles
This technical note will help those maintaining or repairing rolling stock in detecting, and if appropriate, remedying corrosion. It covers current…
ERTMS National Identities Management
This document sets out the requirements for arrangements for the management of the ERTMS National Identities on the GB mainline railway.
GERT8072 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements and guidance for new, renewed and upgraded ac energy subsystem, and the interfaces to rolling stock and operation…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements and guidance for the alternating current (ac) energy subsystem for all rolling stock operating over…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements for the alternating current (ac) energy subsystem and the interfaces to rolling stock operating over the ac…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements to the alternating current (ac) energy subsystem for all rolling stock operating over the Great Britain…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Train front-end visibility requirements and safe integration
This technical note clarifies the application of standards and legislation for front-end visibility and safe integration of rolling stock within the…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Compatibility Requirements for Track Circuit Assisters (TCAs) on Rail Vehicles
This sets out Great Britain (GB) requirements on where TCAs shall be fitted onto a vehicle and how they shall be set up.
GMRT2477 Iss 2
September 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Functionality and Management of Track Circuit Assisters (TCAs) on Rail Vehicles
This document sets out requirements for the functionality, testing and management of failures of TCAs on rail vehicles.
Recommendations for the Risk Assessment of Buffer Stops and End Impact Walls
This document gives details of a recommended method which, if followed, would meet the requirements of section 11, Buffer Stops and End Impact Walls,…
GCRC5633 Iss 2
June 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GIGN7616 Iss 2
June 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
Rail Industry Standard for Station Infrastructure
This document has been published to provide a voluntary standard on station infrastructure, for infrastructure managers responsible for managing and…
RIS-7700-INS Iss 2
June 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
AWS and TPWS Handbook
You will need this document if you carry out the duties of a driver or signaller. Information on changes to this issue can be found in the Rule Book…
IWA or COSS setting up safe systems of work within possessions on ERTMS lines where lineside signals are not provided
You will need this handbook if you are an IWA or COSS setting up safe systems of work within ERTMS possessions. This document has been updated as part…
GERT8000-HB9 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 1
Instructions for track workers who use emergency protection equipment
This handbook is for those personnel who need to go on the operational railway to carry out their duties, and have been trained to carry out emergency…
GERT8000-HB2 Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Duties of the person in charge of the possession (PICOP) on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the person in charge of the possession (PICOP) on ERTMS lines. This document has been…
GERT8000-HB11 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Engineering Supervisor's Certificate
Engineering supervisor's certificate for use on ERTMS level 2 without lineside signals routes.
Duties of a level crossing attendant
You will need this handbook if you carry out the duties of a level crossing attendant. This document has be updated as part of the December 2015 Rule…
GERT8000-HB18 Iss 3
December 2015
Withdrawn
- Impact Assessments 1
Proceed-on-Sight Authority (PoSA)
You will need this module if your duties require you to identify and understand the meaning of PoSA signals. This document has be updated as part of…
Trains or shunting movements detained on running lines
You will need this module if you carry out the duties of a driver, shunter or signaller.
GERT8000-S4 Iss 4
December 2015
Withdrawn
- Impact Assessments 2
Possession arrangements form (T3 ERTMS)
Possession arrangements form (T3 ERTMS) for use on ERTMS level 2 without lineside signals routes.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.