Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Corrosion of rail vehicles
This technical note will help those maintaining or repairing rolling stock in detecting, and if appropriate, remedying corrosion. It covers current…
ERTMS National Identities Management
This document sets out the requirements for arrangements for the management of the ERTMS National Identities on the GB mainline railway.
GERT8072 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements and guidance for new, renewed and upgraded ac energy subsystem, and the interfaces to rolling stock and operation…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements and guidance for the alternating current (ac) energy subsystem for all rolling stock operating over…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements for the alternating current (ac) energy subsystem and the interfaces to rolling stock operating over the ac…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements to the alternating current (ac) energy subsystem for all rolling stock operating over the Great Britain…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Train front-end visibility requirements and safe integration
This technical note clarifies the application of standards and legislation for front-end visibility and safe integration of rolling stock within the…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Rolling Stock Electromagnetic Compatibility with Trackside CCS Subsystems
This document gives guidance on achieving rolling stock electromagnetic compatibility with control, command and signalling (CCS) subsystems, through…
Rail Traffic Loading Requirements for the Design of Railway Structures
GCGN5612 gives guidance on the background and application of the rail traffic loading requirements for the design of railway structures set out in BS…
GCGN5612 Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Signing of Permissible Speeds
This document sets out requirements, rationale and guidance for signing of permissible speeds applicable to trains operated on the Great Britain (GB)…
RIS-0734-CCS Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Signing of Temporary and Emergency Speed Restrictions
This document sets out requirements, rationale and guidance for signing of Temporary Speed Restrictions (TSRs) and Emergency Speed Restrictions (ESRs)…
RIS-0735-CCS Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Vehicle Registration, Marking and Numbering
This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline network.
RIS-2453-RST Iss 2.1
September 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Clarification on drugs and Alcohol testing for safety-critical workers
This technical note aims to provide a greater understanding of the importance of drugs and alcohol testing for safety-critical workers by providing…
Managing Low Adhesion
This standard sets out a framework to develop, implement, monitor and review the effectiveness of site-specific plans to manage low adhesion at…
Lineside Signal and Indicator Product Design and Assessment Requirements
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
GKRT0057 Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Rail Industry Standard for Driving Cabs
This document sets out supplementary requirements for the design, layout and operational equipment in driving cabs of rail vehicles to the Locomotive…
RIS-2761-RST Iss 1.1
June 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Duties of a points operator and route-setting agent - moving and securing points by hand
This handbook is for those personnel who has duties of a points operator and route-setting agent - moving and securing points by hand. Information on…
GERT8000-HB4 Iss 1
December 2014
Withdrawn
- Impact Assessments 2
Duties of the lookout and site warden
This handbook is for those personnel who have duties of the lookout and site warden. Information on changes to this issue can be found in the Rule…
GERT8000-HB3 Iss 2
December 2014
Withdrawn
- Impact Assessments 1
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.