Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Electric token block regulations
You will need this module if you carry out the duties of a signaller in an electric token block area.
Tokenless block regulations
You will need this module if you carry out the duties of a signaller in a tokenless block area.
No-signaller token regulations
You will need this module if you carry out the duties of a signaller in a no-signaller token area. You will also need module TS8 One-train working…
One-train working regulations
You will need this module if you carry out the duties of a signaller in a one-train working area, whether or not a train staff is provided, and a…
General safety responsibilities and personal track safety for non-trackworkers
You will need this module if you carry out the duties of: • a train driver • a guard • a shunter • a designated person (DP) • a signaller • a crossing…
GERT8000-G1 Iss 9
December 2022
Withdrawn
- Impact Assessments 1
Absolute block regulations
You will need this module if you carry out the duties of a signaller in an absolute block area.
GERT8000-TS3 Iss 7
December 2022
Withdrawn
- Impact Assessments 1
- Deviations 3
Possession of an ERTMS running line for engineering work where lineside signals are not provided
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 ERTMS Iss 4
December 2022
Withdrawn
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Arrangements Concerning the Non-Operation of Track Circuits During the Leaf Fall Contamination Period
This document details the requirements for identifying the need for, introduction and subsequent removal of, restrictions to normal operations to…
RIS-3708-TOM Iss 1
September 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
ERTMS/ETCS National Values
This Rail Industry Strandard (RIS) contains requirements and guidance for a process to determine or revise a set of values of ERTMS/ETCS National…
GERT8408 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
GEGN8608 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Ground Frames and Shunters' Releases
This document sets out the interface requirements for ground frames and shunters' releases that may be operated by railway undertaking personnel.
GKRT0077 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 2
GKGN0677 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Possession Arrangements Form
This form is used by the PICOP to record the arrangements for a possession of a running line.
Work-site Certificate
This form is used by the Engineering Supervisor to record arrangements for setting up work sites within a possession of a running line.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.