Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:ERTMS Handbook
You will need this handbook if you need to understand how the European Rail Traffic Management System (ERTMS) operates on the GB network.
Process for Adding, Removing or Modifying Lettered Differential Permissible Speeds
This document sets out requirements and guidance to support the process of adding, removing or modifying a Lettered Differential Permissible Speed…
Signaller's Form for Working Single and Bi-Directional ERTMS Lines by Pilot
Signaller's form for working of single and bi-directional ERTMS lines by pilot.
Form RT3155 ERTMS Iss 06-13
December 2022
Withdrawn
Driver’s Ticket for Working Single and Bi-Directional Lines by Pilot
This form is issued by the pilot to drivers and records the details for the working of trains over a single or bi-directional line by pilot, during a…
Form RT3156 Iss 3
December 2022
Withdrawn
Written Order 04 Permission to Make a Wrong-Direction Movement Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Form RTWO04 Iss 12-13
December 2022
Withdrawn
Pilot's form for working of single and bi-directional ERTMS lines by pilot
Pilot's form for working of single and bi-directional ERTMS lines by pilot.
Form RT3154 ERTMS Iss 06-13
December 2022
Withdrawn
Driver’s Ticket for Working Single and Bi-Directional Lines by Pilot
This form is issued by the pilot to drivers and records the details for the working of trains over a single or bi-directional line by pilot, during a…
Form RT3156 ERTMS Iss 06-13
December 2022
Withdrawn
Signaller's Single Line Working Form
This form is used by the signaller to record the arrangements for implementing single line working.
Written Order 05 Permission To Proceed Under Modified Working Arrangements on Single and Bi-Directional Lines Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Form RTWO05 Iss 12-13
December 2022
Withdrawn
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Arrangements Concerning the Non-Operation of Track Circuits During the Leaf Fall Contamination Period
This document details the requirements for identifying the need for, introduction and subsequent removal of, restrictions to normal operations to…
RIS-3708-TOM Iss 1
September 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
ERTMS/ETCS National Values
This Rail Industry Strandard (RIS) contains requirements and guidance for a process to determine or revise a set of values of ERTMS/ETCS National…
GERT8408 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
GEGN8608 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Ground Frames and Shunters' Releases
This document sets out the interface requirements for ground frames and shunters' releases that may be operated by railway undertaking personnel.
GKRT0077 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 2
GKGN0677 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Possession Arrangements Form
This form is used by the PICOP to record the arrangements for a possession of a running line.
Work-site Certificate
This form is used by the Engineering Supervisor to record arrangements for setting up work sites within a possession of a running line.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.