Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:ERTMS Handbook
You will need this handbook if you need to understand how the European Rail Traffic Management System (ERTMS) operates on the GB network.
Process for Adding, Removing or Modifying Lettered Differential Permissible Speeds
This document sets out requirements and guidance to support the process of adding, removing or modifying a Lettered Differential Permissible Speed…
Signaller's Form for Working Single and Bi-Directional ERTMS Lines by Pilot
Signaller's form for working of single and bi-directional ERTMS lines by pilot.
Form RT3155 ERTMS Iss 06-13
December 2022
Withdrawn
Driver’s Ticket for Working Single and Bi-Directional Lines by Pilot
This form is issued by the pilot to drivers and records the details for the working of trains over a single or bi-directional line by pilot, during a…
Form RT3156 Iss 3
December 2022
Withdrawn
Written Order 04 Permission to Make a Wrong-Direction Movement Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Form RTWO04 Iss 12-13
December 2022
Withdrawn
Pilot's form for working of single and bi-directional ERTMS lines by pilot
Pilot's form for working of single and bi-directional ERTMS lines by pilot.
Form RT3154 ERTMS Iss 06-13
December 2022
Withdrawn
Driver’s Ticket for Working Single and Bi-Directional Lines by Pilot
This form is issued by the pilot to drivers and records the details for the working of trains over a single or bi-directional line by pilot, during a…
Form RT3156 ERTMS Iss 06-13
December 2022
Withdrawn
Signaller's Single Line Working Form
This form is used by the signaller to record the arrangements for implementing single line working.
Written Order 05 Permission To Proceed Under Modified Working Arrangements on Single and Bi-Directional Lines Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Form RTWO05 Iss 12-13
December 2022
Withdrawn
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4.1
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Application of the Entity in Charge of Maintenance Regulations
This document gives guidance on the application of regulations on entities in charge of maintenance (ECM) with respect to freight wagons that are used…
Verification of Conformity of Engineering Change to Rail Vehicles
The document sets out a process for verification of conformity of engineering change against applicable requirements. This process can be adopted by…
RIS-2700-RST Iss 2
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Technical Notes 3
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 4
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7.1
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
Determination of Aerodynamic Rolling Moment Coefficient
This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…
GMRC2542 Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Amendments: 1
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track Machines (OTMs) in running mode.
GMRT2400 Iss 6.2
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
- Deviations 4
GSM-R Handbook
This handbook is intended a guidance to users of the GSM-R system used on the GB mainline railway.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Code of Practice for Handling Servicable Rail with RRV Excavator Cranes Including Thimbling
This Code of Practice details the equipment and working practices for handling and thimbling of serviceable rail, using RRV excavator cranes, to…
COP0005 Iss 5
December 2019
Withdrawn
Code of Practice for OTP Machine ~ Crane Controller Checklists
This Code of Practice details a recommended standard industry checklist for Machine and Crane Controllers when using On-Track Plant. This checklist…
COP0016 Iss 4
December 2019
Withdrawn
Winter Poster 2019
This poster is provided by the M&EE Networking Group to remind OTM operators to be prepared for Winter. Be prepared, keep focused, stay alert and…