Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Duties of a designated person (DP) and people working on rail vehicles
You will need this module if you carry out the duties of a designated person or person working on a rail vehicle.
GERT8000-T10 Iss 5
December 2022
Withdrawn
- Impact Assessments 1
Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure
This document sets out requirements and responsibilities for the assessment of technical compatibility at route level for vehicles and infrastructure.
RIS-8270-RST Iss 1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Passenger Train Dispatch and Platform Safety Measures
This document sets out requirements and guidance for the development, review and implementation of passenger train dispatch processes and measures to…
RIS-3703-TOM Iss 4.1
September 2022
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Single Line Working
You will need this module if you carry out the duties of a driver, pilot or signaller.
Trespass Risk Assessment
This document provides a common framework for trespass risk assessments, developed from the outputs of RSSB research project T1183 - Good practice…
Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the ES or SWL on ERTMS lines.
GERT8000-HB12 ERTMS Iss 2
December 2022
Withdrawn
- Impact Assessments 1
Defective On-Train Equipment
This document sets out requirements to be applied when on-train equipment becomes defective and provides guidance to assist the railway undertakings…
RIS-3437-TOM Iss 2
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Working single and bi-directional lines by pilot
You will need this module if you carry out the duties of a driver, pilot or signaller.
GERT8000-P2 Iss 6
December 2022
Withdrawn
- Impact Assessments 1
Pilot's form for working of single and bi-directional lines by pilot
This form is used by the pilot to record the details for the working of trains over single or bi-directional lines by pilot, during a failure or when…
Form RT3154 12-03
December 2022
Withdrawn
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Functioning and Control of Exterior Doors on Passenger Vehicles
This document provides GB requirements for exterior doors and Selective Door Operation (SDO) systems.
GMRT2473 Iss 2
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 14
GEGN8577 Iss 3
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Weekly Operating Notice, Periodical Operating Notice and the Sectional Appendix
This document sets out the arrangements for the production of information relating to engineering work, alterations to track and signalling…
GORT3215 Iss 3
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Guidance on the Application of the Control Command and Signalling TSI
This guidance note has been produced to provide application guidance on the CCS TSI. The CCS TSI was adopted by Commission Regulation (EU) 2016/919/EC…
Positioning of Lineside Telephones
This document sets out the requirements for assessing the positioning of lineside operational telephones and the provision of information labels.
GERT8048 Iss 2
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
GEGN8648 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
Information for Safe Train Operation
This document sets out requirements for information to be provided by the railway undertaking to the infrastructure manager regarding train running on…
GORT3436 Iss 3
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 7
June 2025
Withdrawn
- Impact Assessments 2
- Deviations 2
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).