Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Interface between Station Platforms, Track, Trains and Buffer Stops
RIS-7016-INS brings together requirements to provide an integrated and consistent set covering station platforms, the interface between platforms,…
RIS-7016-INS Iss 1.2
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-7700-INS Iss 3
June 2018
Live
- Briefing Notes: 1
- Impact Assessments 1
Assessment of Compatibility of Rolling Stock and Infrastructure - Gauging and Stepping Distances
This document sets out requirements and responsibilities for the assessment of gauging compatibility and of stepping distances between rolling stock…
GERT8273 Iss 1
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-7016-INS Iss 1.2
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Storage and Recommissioning of Rail Vehicles
This document sets out guidance on the storage and recommissioning of rail vehicles that are not to be operated on the GB mainline railway for an…
GMGN2571 Iss 1
June 2022
Withdrawn
- Briefing Notes: 1
Format and Methods for Defining Vehicle Gauging Data
This document sets out requirements, rationale and guidance concerning how vehicle gauging data is generated and the format in which it is recorded.…
RIS-2773-RST Iss 1
June 2022
Withdrawn
- Briefing Notes: 1
- Amendments: 4
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4.1
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Application of the Entity in Charge of Maintenance Regulations
This document gives guidance on the application of regulations on entities in charge of maintenance (ECM) with respect to freight wagons that are used…
Verification of Conformity of Engineering Change to Rail Vehicles
The document sets out a process for verification of conformity of engineering change against applicable requirements. This process can be adopted by…
RIS-2700-RST Iss 2
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Technical Notes 3
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 4
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7.1
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
Determination of Aerodynamic Rolling Moment Coefficient
This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…
GMRC2542 Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Amendments: 1
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track Machines (OTMs) in running mode.
GMRT2400 Iss 6.2
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
- Deviations 4
Permissible speed indicators (km/h)
This document provides design details for AD01k sign - Permissible speed indicators (km/h).
Permissible speed indicators (mph)
This document provides design details for AD01m sign - Permissible speed indicators (mph).
Points identification plates
This document provides design details for AC10 sign - Points identification plates.
Permissible speed indicators (km/h) for limited clearance
This document provides design details for AD02k sign - Permissible speed indicators (km/h) for limited clearance.
Termination of AWS gap
This document provides design details for AA02 sign - Termination of AWS gap.
Commencement of AWS gap
This document provides design details for AA01 sign - Commencement of AWS gap.
Signs at access points - information
This document provides design details for BC01 sign - Signs at access points - information.
Danger from passing trains
This document provides design details for CA01 sign - Danger from passing trains.
Danger - No unauthorised access
This document provides design details for CA03 sign - Danger - no authorised access.
Bridge strike information
This document provides design details for CD02 sign - Bridge strike information.
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.