Menu
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:

Live
Issue Date: June 2022

GB Requirements for Platform Height, Platform Offset and Platform Width

GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.

GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Iss 1.1
September 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 52
Live
Issue Date: June 2022

Lettered Differential Permissible Speeds Classification

This document sets out requirements and guidance for the classification of rail vehicles to the lettered differential permissible speed categories.

Rail Vehicle Lettered Differential Speeds Classification
RIS-2711-RST Iss 1
June 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Withdrawn
Issue Date: June 2022
Live
Issue Date: March 2022

Accident and Incident Investigation

This document sets out requirements and guidance for the investigation of adverse events involving more than one duty holder so that system…

Rail Industry Standard for Accident and Incident Investigation
RIS-3119-TOM Iss 2.2
March 2022
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Live
Issue Date: March 2022

Requirements for Driving Cabs of Railway Vehicles

This document sets out national technical rules for driving cabs of railway vehicles on visibility from within, emergency exit dimensions and…

Requirements for Driving Cabs of Railway Vehicles
GMRT2161 Iss 2
March 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: March 2022

Drugs and alcohol testing for safety-critical workers

This document provides transport operators with the industry-agreed standard for testing safety-critical workers for drugs and alcohol. It contains…

Testing Railway Safety Critical Workers for Drugs and Alcohol
RIS-8070-TOM Iss 1
March 2022
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Guidance on the Management of Drugs and Alcohol
GEGN8570 Iss 2
March 2022
Withdrawn
  • Briefing Notes: 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2020

Management of Route Knowledge

This document sets out requirements and guidance relating to the route knowledge of staff. This includes training, development, monitoring and…

Rail Industry Standard for Management of Route Knowledge for Drivers, Train Managers, Guards and Driver Managers
RIS-3702-TOM Iss 2
March 2020
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Withdrawn
Issue Date: March 2020
Withdrawn
Issue Date: March 2020
Withdrawn
Issue Date: February 2020
Live
Issue Date: January 2020

Provisional SPAD Data Collection Form (Infrastructure Manager)

Infrastructure managers and railway undertakings shall use the GORT3119 designated Provisional SPAD Data Collection forms when investigating signals…

Provisional SPAD Data Collection Form (Infrastructure Manager)
Form RT3119-A Iss 7
January 2020
Withdrawn
  • Briefing Notes: 1
Live
Issue Date: January 2020

Provisional ERTMS SPAD Data Collection Form (Infrastructure Manager)

Infrastructure managers and railway undertakings shall use the GORT3119 designated Provisional SPAD Data Collection forms when investigating signals…

Provisional ERTMS SPAD Data Collection Form (Infrastructure Manager)
Form RT3119-C Iss 2
January 2020
Withdrawn
  • Briefing Notes: 1
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: June 2025

Changes to National Operations Publications for June 2025

This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…

Live
Issue Date: March 2025

Master Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Master Manual
GERM8000-master-module Iss 14.1
June 2025
Withdrawn
Live
Issue Date: March 2025

DC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…

DC electrified lines
GERT8000-HB17 Iss 4
June 2025
Withdrawn
  • Impact Assessments 1
Live
Issue Date: March 2025

Train Operations Staff Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Operations Staff Manual
GERM8000-trainoperationsstaff Iss 14.1
June 2025
Withdrawn
Live
Issue Date: March 2025

Rule Book Briefing Leaflet

Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.

Rule Book Briefing Leaflet
GERT8000-RBBL Iss 40.1
June 2025
Withdrawn
Live
Issue Date: March 2025

Rule Book Module Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000).

Rule Book Module Issue History
GERT8000 Issue Iss 37
June 2025
Withdrawn
Live
Issue Date: March 2025

Rule Book Handbook Issue History

This document contains updates to align with changes to Rule Book handbook issues (GERT8000).

Rule Book Handbook Issue History
GERT8000 Issue HB Iss 18
June 2025
Withdrawn
Live
Issue Date: March 2025

Signals, Handsignals, Indicators and Signs Handbook

You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.

Signals, Handsignals, Indicators and Signs Handbook
RS521 Iss 7
June 2025
Withdrawn
  • Impact Assessments 2
  • Deviations 2
Live
Issue Date: March 2025

DC Electrified Lines

You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…

DC Electrified Lines
GERT8000-DC Iss 5
June 2025
Withdrawn
  • Impact Assessments 1
Live
Issue Date: March 2025

Track Workers Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Track Workers Manual
GERM8000-trackworkers Iss 13.1
June 2025
Withdrawn
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: June 2015

Gradient sign

This document provides design details for AK202 - Gradient sign

Live
Issue Date: June 2015

Spring catch board

This document provides design details AK204 sign - Spring catch board.

Live
Issue Date: June 2015

Train class specific instruction

This document provides design details for AK206 sign - Train class specific instruction.

Live
Issue Date: June 2015

Coasting board

This document provides design details for AK208 sign - Coasting board.

Live
Issue Date: June 2015

Warnings for train crew

This document provides design details for AK210 sign - Warnings for train crew.

Live
Issue Date: June 2015

Infrastructure location names, information and references

This document provides design details for AK212 sign - Infrastructure location names, information and references.

Live
Issue Date: June 2015

Warnings

This document provides design details for BA02 sign - Warnings.

Live
Issue Date: June 2015

Termination of adhesion condition

This document provides design details for AK214 sign - Termination of adhesion condition

Live
Issue Date: June 2015

Mind the gap / step

This document provides design details for CA02 sign - Mind the gap / step.

Live
Issue Date: June 2015

Telephone number

This document provides design details for DA01 sign - Telephone number

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:

Live
Issue Date: June 2025

Misuse of MEWPs

This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.

Misuse of MEWPs
Poster P9 Iss 1
June 2025
Withdrawn
Live
Issue Date: June 2025

Plant Exclusion Zones

This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…

Plant Exclusion Zones
Poster P10 Iss 1
June 2025
Withdrawn
Live
Issue Date: June 2025

Emergency Haulage by OTMs

This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…

Live
Issue Date: June 2025

Use and Maintenance of Full Electric/Hybrid Powered OTP

This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…

Live
Issue Date: June 2025

Injection Injury

This poster details the actions to be taken following a hydraulic injection injury.

Injection Injury
Poster P11 Iss 1
June 2025
Withdrawn
Live
Issue Date: June 2025

Cross Tracking of On Track Plant

OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.

Live
Issue Date: June 2025

AFFF Fire Extinguishers

This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…

AFFF Fire Extinguishers
Poster P8 Iss 1
June 2025
Withdrawn
Live
Issue Date: June 2025

RRV Braking

This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…

RRV Braking
Poster P4 Iss 3
June 2025
Withdrawn
Live
Issue Date: June 2025

Piling using OTP

This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…

Code of Practice for Piling using OTP
COP0034 Iss 2
June 2025
Withdrawn
Live
Issue Date: May 2025

Plant Activities with Any Line Open

All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.