Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.
GIRT7020 Iss 1.1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
Lettered Differential Permissible Speeds Classification
This document sets out requirements and guidance for the classification of rail vehicles to the lettered differential permissible speed categories.
RIS-2711-RST Iss 1
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Accident and Incident Investigation
This document sets out requirements and guidance for the investigation of adverse events involving more than one duty holder so that system…
RIS-3119-TOM Iss 2.2
March 2022
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Requirements for Driving Cabs of Railway Vehicles
This document sets out national technical rules for driving cabs of railway vehicles on visibility from within, emergency exit dimensions and…
GMRT2161 Iss 2
March 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Drugs and alcohol testing for safety-critical workers
This document provides transport operators with the industry-agreed standard for testing safety-critical workers for drugs and alcohol. It contains…
RIS-8070-TOM Iss 1
March 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GEGN8570 Iss 2
March 2022
Withdrawn
- Briefing Notes: 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Guidance on the Operation and Traffic Management Technical Specification for Interoperability
This document provides guidance on interpretation of points within the Operation and Traffic Management TSI (OPE TSI) where, owing to incomplete or…
GOGN3615 Iss 1
September 2017
Withdrawn
- Briefing Notes: 2
Identification of Signalling and Related Equipment
This document sets out the principles for ensuring that signalling and related assets are uniquely identified.
GKGN0609 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GKRT0009 Iss 4
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Tilting Trains: Controlling Tilt Systems to Maintain Clearances
This document sets out the means by which Tilting Trains are permitted to utilise the tilt mechanism over routes, parts of which contain sections…
GERC8517 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GERT8019 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
Controlling the Speed of Tilting Trains through Curves
This document sets out the means by which tilting trains may be operated at higher speeds than non-tilting trains around curves.
GERC8517 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GERT8012 Iss 1
December 2017
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
- Deviations 2
Engineering Requirements for Dispatch of Trains from Platforms
This document sets out the minimum engineering requirements for the facilities used in dispatching trains from platforms.
GERT8060 Iss 2
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
GEGN8560 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
Low Voltage Power Supplies in Electrified Areas
This document includes requirements for earthing, bonding and the control of traction currents in low voltage power supplies in areas of the GB…
GLRT1255 Iss 1
June 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
ERTMS Key Management
This document contains requirements for the management of cryptographic keys on the mainline railway to facilitate secure European Rail Traffic…
GEGN8603 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Guidance on the Energy TSI
This document gives guidance on interpreting the requirements of the Energy Technical Specification for Interoperability 2014 (ENE TSI) Commission…
GEGN8600 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Amendments: 1
GSM-R Train Voice Radio Systems
This document sets out the requirements for the application of GSM-R train voice radio systems, specifically interface requirements for the…
RIS-0794-CCS Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
GKRT0094 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
GKGN0694 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 7
June 2025
Withdrawn
- Impact Assessments 2
- Deviations 2
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Code of Practice for Audit Protocol for Supply of Machine / Crane Controllers
This Audit Protocol provides a comprehensive list of questions for an auditor to ask and detailed guidance of what is expected of an auditor whilst…