Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
Lineside Operational Signs
This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB catalogue. It also…
RIS-0733-CCS Iss 1.2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Power changeover not applicable
This document provides design details for sign AJ16 – Power changeover not applicable.
Provision of Signage at Power Changeover Locations
This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.
RIS-3784-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Requirements for the operation of freight trains and the conveyance of dangerous goods by any train
This document sets out requirements and guidance relating to the safe operation of freight trains and the safe movement of dangerous goods.
RIS-3781-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Recording of Rolling Stock Data
This document provides a standard on rolling stock shared data. Recording of some data is mandatory to register a vehicle; other data may be useful,…
RIS-2706-RST Iss 2
June 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
CCS System Transitions
This standard sets out requirements for controlling the hazards that arise when a train changes from using one type of signalling system, or train…
RIS-0036-CCS Iss 1
June 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Application of the PRM NTSN
This document contains guidance on the application of the PRM NTSN, particularly when undertaking work that would not necessarily constitute an…
Rail Vehicle Structures
This document sets out requirements and guidance for the design of rail vehicle structures. A related document (SD001 issue two) contains all the…
RIS-2780-RST Iss 1
June 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
System Requirements for the Introduction and Operation of Multi-Mode Rolling Stock
This document sets out requirements and guidance to support the introduction and operation of multi-mode rolling stock onto the Great Britain (GB)…
AWS and TPWS Application Requirements
This document sets out requirements and guidance for the application of the United Kingdom (UK) Class B train protection system ‘TPWS’, which…
RIS-0775-CCS Iss 2
March 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
AWS and TPWS Interface Requirements
This document defines the track/train interface requirements for the United Kingdom (UK) Class B train protection system ‘TPWS’, which comprises the…
GERT8075 Iss 3
June 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 2
Application of human factors within safety management systems
This document provides guidance on the application of human factors principles for railway organisations. It has been developed to support…
RS232 Iss 1
March 2021
Withdrawn
- Briefing Notes: 1
ERTMS/ETCS DMI National requirements
This document sets out requirements for European Rail Traffic Management System/ European Train Control System (ERTMS/ETCS) Driver Machine Interface…
GERT8402 Iss 2
June 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 8
Modified Working Arrangements Driver's Ticket
This form has been revised to come in line with the New Approach. This form is issued by the signaller to drivers and records the details for the…
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.