Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4.1
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Application of the Entity in Charge of Maintenance Regulations
This document gives guidance on the application of regulations on entities in charge of maintenance (ECM) with respect to freight wagons that are used…
Verification of Conformity of Engineering Change to Rail Vehicles
The document sets out a process for verification of conformity of engineering change against applicable requirements. This process can be adopted by…
RIS-2700-RST Iss 2
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Technical Notes 3
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 4
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7.1
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
Determination of Aerodynamic Rolling Moment Coefficient
This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…
GMRC2542 Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Amendments: 1
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track Machines (OTMs) in running mode.
GMRT2400 Iss 6.2
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
- Deviations 4
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
MEWP Planning
This poster is provided by the M&EE Networking Group to remind industry that all MEWP activities must be properly planned and site specific - even if…
Code of Practice for Route Conductor Assurance
This Code of Practice is to assist Duty Holders to identify, assess and control risks which may arise from the activities of supplying and engaging in…
OTP Tandem Lifting and Indication
This poster is provided by the M&EE Networking Group to remind planners to use the latest planning information/tools provided by the RCI suppliers for…
Lifting Accessories Misuse
This poster is provided by the M&EE Networking Group to remind planners and users of plant about the dangers associated with the misuse of lifting…
Lift and Carry Using OTP In Road Mode
This poster is provided by the M&EE Networking Group to remind the operator of road-rail excavator cranes of the need for caution because lift and…
RCI Motion Cut
This poster is provided by the M&EE Networking Group to remind the industry that the RCI function automatically stops further movement of the machine…
Crane Controller Competence for Twin Jib Cranes
This poster is provided by the M&EE Networking Group to remind industry that when using a twin jib crane under the control of one operator then there…
Using Outriggers / Stabilisers on Plant
This poster is provided by the M&EE Networking Group to reminder planners and users of plant with outriggers that stability can be seriously affected…