Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Guidance on the Safety in Railway Tunnels Technical Specification for Interoperability
This document gives guidance on interpreting the requirements of the Safety in Railway Tunnels Technical Specification for Interoperability (SRT TSI).…
GIGN7619 Iss 1
September 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Signalling Lockout Systems to Protect Railway Undertaking Personnel
This document sets out requirements and guidance for signalling lockout systems provided or railway undertaking personnel to use.
GKRT0212 Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 2
GKGN0612 Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Provision of Information and Signs for Access on the Railway
This document sets out requirements for the provision of information about access to and alongside the railway. It specifies where operational safety…
RIS-3413-TOM Iss 1
September 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Guidance for the Development and Design Considerations of Passenger Rolling Stock Depots
This document provides guidance to industry to inform the development and design of passenger rolling stock depots. From the point at which a depot is…
AWS and TPWS Handbook
You will need this document if you carry out the duties of a driver or signaller. Information on changes to this issue can be found in the Rule Book…
Proceed-on-Sight Authority (PoSA)
You will need this module if your duties require you to identify and understand the meaning of PoSA signals. This document has be updated as part of…
Trains or shunting movements detained on running lines
You will need this module if you carry out the duties of a driver, shunter or signaller.
GERT8000-S4 Iss 4
December 2015
Withdrawn
- Impact Assessments 2
IWA or COSS setting up safe systems of work within possessions on ERTMS lines where lineside signals are not provided
You will need this handbook if you are an IWA or COSS setting up safe systems of work within ERTMS possessions. This document has been updated as part…
GERT8000-HB9 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 1
Instructions for track workers who use emergency protection equipment
This handbook is for those personnel who need to go on the operational railway to carry out their duties, and have been trained to carry out emergency…
GERT8000-HB2 Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Duties of the person in charge of the possession (PICOP) on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the person in charge of the possession (PICOP) on ERTMS lines. This document has been…
GERT8000-HB11 ERTMS Iss 1
December 2015
Withdrawn
- Impact Assessments 2
Engineering Supervisor's Certificate
Engineering supervisor's certificate for use on ERTMS level 2 without lineside signals routes.
Duties of a level crossing attendant
You will need this handbook if you carry out the duties of a level crossing attendant. This document has be updated as part of the December 2015 Rule…
GERT8000-HB18 Iss 3
December 2015
Withdrawn
- Impact Assessments 1
Possession arrangements form (T3 ERTMS)
Possession arrangements form (T3 ERTMS) for use on ERTMS level 2 without lineside signals routes.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.