Menu
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: August 2023

Examination and repair of structural corrosion in Mark 1 type rolling stock

This technical note will help those maintaining or repairing Mark 1 type rolling stock to detect and remedy corrosion on this type of vehicle. This…

Live
Issue Date: June 2023

Axle Bearing Condition Monitoring

This document sets out requirements and guidance for condition monitoring of axle bearings, whether by trackside or onboard detection systems.

Guidance on Axlebox Condition Monitoring - Hot Axlebox Detection
GEGN8614 Iss 1
June 2023
Withdrawn
  • Briefing Notes: 1
Axlebox Condition Monitoring - Hot Axlebox Detection
GERT8014 Iss 2
June 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Amendments: 1
  • Deviations 1
Live
Issue Date: June 2023

Movement of Continental Wagons on the GB Network

RIS-2770-RST Iss 1 sets out requirements and guidance around the process of registering and assessing compatibility of wagons not registered in GB for…

Movement of Continental Wagons on the GB Network
RIS-2770-RST Iss 1
June 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: June 2023

Assessment of Passenger Seat Comfort

This document gives guidance on the assessment of static comfort for passenger seats on rolling stock. It includes criteria to measure aspects of a…

Live
Issue Date: June 2023

ERTMS/ETCS Baseline 3 Onboard Subsystem Requirements

This document sets out the industry agreed requirements and guidance for the Great Britain (GB) application of the ERTMS/ETCS Baseline 3 onboard…

ERTMS/ETCS Baseline 3 Onboard Subsystem Requirements: Retrofit
RIS-0797-CCS Iss 1
June 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
ERTMS/ETCS Baseline 3 Onboard Subsystem Requirements: New Trains
RIS-0798-CCS Iss 1
June 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: June 2023

Reporting of adverse events

This technical note will help industry to understand the reporting systems for safety related issues provided by the Rail Safety and Standards Board…

Live
Issue Date: June 2023

Lineside Operational Signs - Product Requirements

This document sets of the requirements of lineside operational signs that support technical compatibility with rail vehicle exterior lighting and…

Lineside Operational Signs - Product Requirements
GIRT7033 Iss 4
June 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Deviations 1
Live
Issue Date: June 2023

Rail Vehicle Structures and Passive Safety

This document sets out requirements for the design and integrity of primary and secondary rail vehicle structures, including interior crashworthiness.

Rail Vehicle Structures and Passive Safety
GMRT2100 Iss 6.1
June 2023
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Live
Issue Date: June 2023

Management of Safety-Related Rail Vehicle Defects

This document defines requirements for recording, analysing and reporting safety-related defects, faults and failures on rail vehicles, plant and…

Reporting High Risk Defects
RIS-8250-RST Iss 1
June 2023
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
  • Amendments: 2
Live
Issue Date: June 2023

Urgent High-Risk Defect Report Form

In the event that the NIR-Online system is unavailable, details of urgent high-risk defects, faults and failures shall be shared by completing and…

Urgent Safety-Related Defect Report Form
Form RT8250 Iss 3
June 2023
Withdrawn
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2025

Rule Book Module Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000).

Rule Book Module Issue History
GERT8000 Issue Iss 37
September 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Rule Book Briefing Leaflet

Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.

Rule Book Briefing Leaflet
GERT8000-RBBL Iss 40.1
November 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Changes to National Operations Publications for March 2025

This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…

Live
Issue Date: March 2025

AC Electrified Lines

You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…

AC Electrified Lines
GERT8000-AC Iss 7
December 2021
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2025

AC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…

AC electrified lines
GERT8000-HB16 Iss 5
December 2021
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2025

Rule Book Handbook Issue History

This document contains updates to align with changes to Rule Book handbook issues (GERT8000).

Rule Book Handbook Issue History
GERT8000 Issue HB Iss 18
September 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

DC Electrified Lines

You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…

DC Electrified Lines
GERT8000-DC Iss 5
December 2021
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2025

DC Electrified Lines

This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…

DC electrified lines
GERT8000-HB17 Iss 4
December 2021
Live Pending Withdrawal
  • Impact Assessments 1
Live
Issue Date: March 2025

Train Operations Staff Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Train Operations Staff Manual
GERM8000-trainoperationsstaff Iss 14.1
November 2024
Live Pending Withdrawal
Live
Issue Date: March 2025

Possession Workers Manual

The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…

Possession Workers Manual
GERM8000-possessionworkers Iss 10.1
November 2024
Live Pending Withdrawal
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: March 2025

Lower pantograph (temporary power changeover)

This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).  

Live
Issue Date: March 2025

Warning of Traction System Changeover

This document provides design details for sign AJ04 - Warning of traction system changeover.  

Warning of traction system changeover
Sign AJ04 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Changeover to or from self-powered

This document provides design details for sign AJ08 - Changeover to or from self-powered.

Live
Issue Date: March 2025

Directional arrows

This document provides design details for sign AJ10 - Directional arrows.  

Live
Issue Date: March 2025

Advance lower pantograph (temporary power changeover)

This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).

Live
Issue Date: March 2025

Changeover to Overhead Electric Traction

This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.

Live
Issue Date: March 2025

Do not raise pantograph

This document provides design details for sign AJ09 - Do not raise pantograph.  

Live
Issue Date: March 2025

Lower Pantograph

This document provides design details for sign AJ03 - Lower pantograph

Lower pantograph
Sign AJ03 Iss 1
March 2025
Withdrawn
Live
Issue Date: March 2025

Indication of route

This document provides design details for sign AJ11 - Indication of route.

Live
Issue Date: March 2025

Do not raise pantograph (temporary power changeover)

This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).

Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: October 2022

Use of warning horn

This poster is provided by the M&EE Networking Group to remind the industry about the use of the warning horn.

Live
Issue Date: July 2022

Code of Practice Protection of Non PTS Holders at OTM Stabling Points

This Code of Practice concerns all OTM stabling points and can be used when non PTS holders need to visit site. The document has been written to…

Live
Issue Date: July 2022

Code of Practice for Use and Loading of MEWPs

This Code of Practice details the use of MEWPs, particularly with processes for loads that should safely be permitted in the work platform of a MEWP.…

Code of Practice for Use and Loading of MEWPs
COP0024 Iss 6
September 2022
Withdrawn
Live
Issue Date: July 2022

Injection Injury

This poster details the actions to be taken following a hydraulic injection injury.

Withdrawn
Issue Date: July 2022
Live
Issue Date: March 2022

Code of Practice for Action to be Taken in the Event of an Accident or Incident Involving OTP

This Code of Practice details the actions to be taken, and by whom, following an accident or incident involving OTP.  It deals with the engineering…

Live
Issue Date: March 2022

Code of Practice for Management of Points within Engineering Work Sites

This Code of Practice is to provide guidance on the arrangements for the Management of Points within Engineering Worksites for all rail borne vehicles…

Live
Issue Date: March 2022

Pulling Rail with Road-Rail Excavator Cranes

This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or…

Pulling Rail with Road-Rail Excavator Cranes
COP0022 Iss 2
June 2022
Withdrawn