Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Management of Control Command and Signalling (CCS) Subsystem Failures, Faults and Defects
This document sets out the management process requirements that apply to safety related failures of control command and signalling (CCS) onboard and…
RIS-0707-CCS Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Technical Notes 1
Engineering Requirements for Steam Locomotives and other Heritage Rail Vehicles
This document sets out the engineering requirements for heritage rail vehicles (including steam locomotives) to support use when operating in heritage…
RIS-4472-RST Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Operational Requirements for GSM-R Radio
This document contains the necessary requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system.…
RIS-3780-TOM Iss 1
September 2023
Withdrawn
- Impact Assessments 1
Track to Train RFID Compatibility
This document sets out requirements for RFID compatibility between train and track, including management of application codes.
Examination and repair of structural corrosion in Mark 1 type rolling stock
This technical note will help those maintaining or repairing Mark 1 type rolling stock to detect and remedy corrosion on this type of vehicle. This…
Axle Bearing Condition Monitoring
This document sets out requirements and guidance for condition monitoring of axle bearings, whether by trackside or onboard detection systems.
GEGN8614 Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
GERT8014 Iss 2
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Deviations 1
Movement of Continental Wagons on the GB Network
RIS-2770-RST Iss 1 sets out requirements and guidance around the process of registering and assessing compatibility of wagons not registered in GB for…
RIS-2770-RST Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Assessment of Passenger Seat Comfort
This document gives guidance on the assessment of static comfort for passenger seats on rolling stock. It includes criteria to measure aspects of a…
ERTMS/ETCS Baseline 3 Onboard Subsystem Requirements
This document sets out the industry agreed requirements and guidance for the Great Britain (GB) application of the ERTMS/ETCS Baseline 3 onboard…
RIS-0797-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-0798-CCS Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Single Line Working
You will need this module if you carry out the duties of a driver, pilot or signaller.
Working single and bi-directional lines by pilot
You will need this module if you carry out the duties of a driver, pilot or signaller.
GERT8000-P2 Iss 6
December 2022
Withdrawn
- Impact Assessments 1
Pilot's form for working of single and bi-directional lines by pilot
This form is used by the pilot to record the details for the working of trains over single or bi-directional lines by pilot, during a failure or when…
Form RT3154 12-03
December 2022
Withdrawn
Signaller's Form for Working Single and Bi-Directional Lines by Pilot
This form is used by signallers to record the details for the working of trains over a single or bi-directional line by pilot, during a failure or…
Form RT3155 12-03
December 2022
Withdrawn
Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the ES or SWL on ERTMS lines.
GERT8000-HB12 ERTMS Iss 2
December 2022
Withdrawn
- Impact Assessments 1
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.