Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Electromagnetic Compatibility of Train Detection Infrastructure with Rail Vehicles
RIS-0725-CCS Iss 1.1 is a rail industry standard correction release on immunity levels of infrastructure-based train detection systems, to provide…
RIS-0725-CCS Iss 1
April 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rail Industry Standard on Control of Mobile communication Equipment use in Driving Cabs
This document contains requirements and guidance for the control of mobile communication equipment use in the driving cabs of trains.
RIS-3776-TOM Iss 1
March 2019
Withdrawn
- Briefing Notes: 1
Hauling Unbraked Fixed Formations in Freight Trains
This document gives guidance on the braking requirements for hauling unbraked multiple units and other fixed formations in a freight train. This…
GMGN2607 Iss 1
March 2019
Withdrawn
- Briefing Notes: 1
Engineering Certification of Railborne Plant and the Assessment of Non-Railborne Plant
This document is the industry agreed standard for the certification of railborne plant and the assessment of non-railborne plant. It provides an…
RIS-1710-PLT Iss 2
March 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Internet Access on Trains for Customer and Operational Railway Purposes
This document is intended to assist in the procurement of system and services to enable Internet access on trains, and suppliers in pre-empting the…
RIS-0700-CCS Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Functioning and Control of Exterior Doors on Passenger Vehicles
This document provides GB requirements for exterior doors and Selective Door Operation (SDO) systems.
GMRT2473 Iss 2
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 14
GEGN8577 Iss 3
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Weekly Operating Notice, Periodical Operating Notice and the Sectional Appendix
This document sets out the arrangements for the production of information relating to engineering work, alterations to track and signalling…
GORT3215 Iss 3
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Guidance on the Application of the Control Command and Signalling TSI
This guidance note has been produced to provide application guidance on the CCS TSI. The CCS TSI was adopted by Commission Regulation (EU) 2016/919/EC…
Positioning of Lineside Telephones
This document sets out the requirements for assessing the positioning of lineside operational telephones and the provision of information labels.
GERT8048 Iss 2
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
GEGN8648 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
Information for Safe Train Operation
This document sets out requirements for information to be provided by the railway undertaking to the infrastructure manager regarding train running on…
GORT3436 Iss 3
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.