Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Permissive Working Risk Assessment and Risk Controls
This document sets out the Control, Command and Signalling (CCS) system requirements for authorising a train movement into an occupied section of…
GKRT0044 Iss 3
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 2
GKGN0644 Iss 2
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Driver Controlled Operation (DCO) On-Train Camera/Monitors (OTCM)
This standard sets out requirements for the functions, design and testing of Driver Controlled Operation (DCO) On-Train Camera/Monitor (OTCM) systems…
RIS-2703-RST Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Requirements for Minimum Signalling Braking and Deceleration Distances
This document specifies the Minimum Signalling Braking Distance (MSBD) and Minimum Deceleration Distance (MDD) for lineside signal spacings and the…
GKRT0075 Iss 4
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 4
GKGN0675 Iss 4
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Interface Requirements for Connected Driver Advisory System
This document sets out requirements for the data interfaces between the infrastructure manager (IM) and the railway undertakings (RUs) for an…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Lineside Signal Aspects and Indications
This document specifies the appearance of lineside signal aspects and indications and the information they convey.
RIS-0758-CCS Iss 1
March 2018
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GKRT0058 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
GKGN0658 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Lineside Signalling Layout Driveability Assessment Requirements
This document sets out requirements for assessing the driveability of lineside signalling systems, and guidance on the process of assessing changes to…
GERT8071 Iss 2
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
GEGN8571 Iss 2
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
GKRT0045 Iss 5
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 8
GKGN0645 Iss 5
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
RIS-0713-CCS Iss 1
March 2018
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
750 V and 1500 V DC Overhead Lines and corresponding Rolling Stock requirements
This document specifies requirements and associated rationale and guidance at the interface between energy subsystems and rolling stock subsystems for…
Magnetic Track Brakes
This document sets out requirements for driver-actuated magnetic track brakes fitted to rail vehicles used on the GB mainline railway.
Train to Infrastructure RFID Compatibility
This document sets out requirements for an RFID system where the tag is on the train and the reader is on the infrastructure. It includes specific…
Guidance on the Use of Escrow Agreements for Rail Applications
This document provides guidance on the use of escrow agreements and is intended to assist in understanding the application of escrow agreements. The…
GEGN8607 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Reporting of Safety Related Information
This document sets out requirements for entering information into the industry's Safety Management Intelligence System (SMIS), and for how that…
RIS-8047-TOM Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Calculation of Enhanced Permissible Speeds for Tilting Trains
This document sets out requirements and guidance for train manufacturers or operators to calculate enhanced permissible speeds for curves on a…
GCRC5521 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
Guidance Note for Safe Integration of CCS Systems with Train Operations
This document provides guidance on assessment of changes that affect the interfaces between Control Command and Signalling (CCS) systems and train…
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 7
June 2025
Withdrawn
- Impact Assessments 2
- Deviations 2
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
End of Emergency special Working
This document provides design details for sign AK215 - End of Emergency Special Working
Temporary Speed Restriction Repeater Warning Board
This document provides design details for AF03 sign - Temporary speed restriction repeater warning board.
Permissible speed warning indicators (mph) for limited clearance
This document provides design details for AD04m sign - Permissible speed warning indicators (mph) for limited clearance.
Permissible speed directional arrows
This document provides design details for AD05 sign - Permissible speed directional arrows.
Enhanced permissible speed indicators
This document provides design details for AE01m sign - Enhanced permissible speed indicators.
Enhanced permissible speed indicators (limited clearance)
This document provides design details for AE02m sign - Enhanced permissible speed indicators (limited clearance).
Enhanced permissible speed warning indicators
This document provides design details for AE03m sign - Enhanced permissible speed warning indicators.
Enhanced permissible speed warning indicators (limited clearance)
This document provides design details for AE04m sign - Enhanced permissible speed warning indicators (limited clearance).
Emergency indicator
This document provides design details for AF01 sign - Emergency indicator.
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.