Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Permissive Working Risk Assessment and Risk Controls
This document sets out the Control, Command and Signalling (CCS) system requirements for authorising a train movement into an occupied section of…
GKRT0044 Iss 3
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 2
GKGN0644 Iss 2
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Driver Controlled Operation (DCO) On-Train Camera/Monitors (OTCM)
This standard sets out requirements for the functions, design and testing of Driver Controlled Operation (DCO) On-Train Camera/Monitor (OTCM) systems…
RIS-2703-RST Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Requirements for Minimum Signalling Braking and Deceleration Distances
This document specifies the Minimum Signalling Braking Distance (MSBD) and Minimum Deceleration Distance (MDD) for lineside signal spacings and the…
GKRT0075 Iss 4
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 4
GKGN0675 Iss 4
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Interface Requirements for Connected Driver Advisory System
This document sets out requirements for the data interfaces between the infrastructure manager (IM) and the railway undertakings (RUs) for an…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Reporting of adverse events
This technical note will help industry to understand the reporting systems for safety related issues provided by the Rail Safety and Standards Board…
Lineside Operational Signs - Product Requirements
This document sets of the requirements of lineside operational signs that support technical compatibility with rail vehicle exterior lighting and…
GIRT7033 Iss 4
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Rail Vehicle Structures and Passive Safety
This document sets out requirements for the design and integrity of primary and secondary rail vehicle structures, including interior crashworthiness.
GMRT2100 Iss 6.1
June 2023
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Management of Safety-Related Rail Vehicle Defects
This document defines requirements for recording, analysing and reporting safety-related defects, faults and failures on rail vehicles, plant and…
RIS-8250-RST Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
Urgent High-Risk Defect Report Form
In the event that the NIR-Online system is unavailable, details of urgent high-risk defects, faults and failures shall be shared by completing and…
Communication of urgent operating advice
This standard sets out requirements, rationale and guidance for reporting and communicating urgent operating safety information.
RIS-3350-TOM Iss 1
June 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Engineering change (software and firmware)
This technical note provides signposts to existing standards and good practice in engineering change management relating to software and…
Freight coupler loads
This technical note will help industry assess the ability of a locomotive to haul loads over a route. It focuses on coupler load capacity and…
Fire-related properties of batteries
This technical note sets out options for improving fire performance of batteries in use on GB mainline rolling stock, and the factors which may need…
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 7
June 2025
Withdrawn
- Impact Assessments 2
- Deviations 2
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Permissible speed indicators (km/h)
This document provides design details for AD01k sign - Permissible speed indicators (km/h).
Permissible speed indicators (mph)
This document provides design details for AD01m sign - Permissible speed indicators (mph).
Points identification plates
This document provides design details for AC10 sign - Points identification plates.
Permissible speed indicators (km/h) for limited clearance
This document provides design details for AD02k sign - Permissible speed indicators (km/h) for limited clearance.
Termination of AWS gap
This document provides design details for AA02 sign - Termination of AWS gap.
Commencement of AWS gap
This document provides design details for AA01 sign - Commencement of AWS gap.
Signs at access points - information
This document provides design details for BC01 sign - Signs at access points - information.
Danger from passing trains
This document provides design details for CA01 sign - Danger from passing trains.
Danger - No unauthorised access
This document provides design details for CA03 sign - Danger - no authorised access.
Bridge strike information
This document provides design details for CD02 sign - Bridge strike information.
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.