Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Guidance on the Safety in Railway Tunnels Technical Specification for Interoperability
This document gives guidance on interpreting the requirements of the Safety in Railway Tunnels Technical Specification for Interoperability (SRT TSI).…
GIGN7619 Iss 1
September 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Signalling Lockout Systems to Protect Railway Undertaking Personnel
This document sets out requirements and guidance for signalling lockout systems provided or railway undertaking personnel to use.
GKRT0212 Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 2
GKGN0612 Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Provision of Information and Signs for Access on the Railway
This document sets out requirements for the provision of information about access to and alongside the railway. It specifies where operational safety…
RIS-3413-TOM Iss 1
September 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
End of Emergency special Working
This document provides design details for sign AK215 - End of Emergency Special Working
Guidance for the Development and Design Considerations of Passenger Rolling Stock Depots
This document provides guidance to industry to inform the development and design of passenger rolling stock depots. From the point at which a depot is…
Line Blockage Form
This form is used by the Signaller, IWA, COSS, PC and SWL to record the details of a line blockage
Form NR3180 Iss 12-17 Issue 2
December 2018
Withdrawn
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Incident Response Planning & Management
This document contains requirements and guidance for the development of rail incident response plans and the management of rail incidents.
RIS-3118-TOM Iss 1
December 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GOGN3518 Iss 1
December 2019
Withdrawn
- Briefing Notes: 1
Confidential Reporting System for Rail Staff
This document is a standard on the basic requirements of a confidential reporting system for rail staff
RIS-3701-TOM Iss 2
December 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Single Line Working
You will need this module if you carry out the duties of a driver, pilot or signaller.
Working single and bi-directional lines by pilot
You will need this module if you carry out the duties of a driver, pilot or signaller.
GERT8000-P2 Iss 6
December 2022
Withdrawn
- Impact Assessments 1
Pilot's form for working of single and bi-directional lines by pilot
This form is used by the pilot to record the details for the working of trains over single or bi-directional lines by pilot, during a failure or when…
Form RT3154 12-03
December 2022
Withdrawn
Signaller's Form for Working Single and Bi-Directional Lines by Pilot
This form is used by signallers to record the details for the working of trains over a single or bi-directional line by pilot, during a failure or…
Form RT3155 12-03
December 2022
Withdrawn
Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the ES or SWL on ERTMS lines.
GERT8000-HB12 ERTMS Iss 2
December 2022
Withdrawn
- Impact Assessments 1
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.