Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Train front-end visibility requirements and safe integration
This technical note clarifies the application of standards and legislation for front-end visibility and safe integration of rolling stock within the…
Process for Adding, Removing or Modifying Lettered Differential Permissible Speeds
This document sets out requirements and guidance to support the process of adding, removing or modifying a Lettered Differential Permissible Speed…
Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure
This document sets out requirements and responsibilities for the assessment of technical compatibility at route level for vehicles and infrastructure.
RIS-8270-RST Iss 1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Passenger Train Dispatch and Platform Safety Measures
This document sets out requirements and guidance for the development, review and implementation of passenger train dispatch processes and measures to…
RIS-3703-TOM Iss 4.1
September 2022
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Trespass Risk Assessment
This document provides a common framework for trespass risk assessments, developed from the outputs of RSSB research project T1183 - Good practice…
Defective On-Train Equipment
This document sets out requirements to be applied when on-train equipment becomes defective and provides guidance to assist the railway undertakings…
RIS-3437-TOM Iss 2
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Client Safety Assurance of High Integrity Software-Based Systems for Railway Applications
This document sets out requirements for safety assurance of high integrity software-based systems for railway applications.
GEGN8650 Iss 1
September 2022
Withdrawn
- Briefing Notes: 1
Interface between Station Platforms, Track, Trains and Buffer Stops
RIS-7016-INS brings together requirements to provide an integrated and consistent set covering station platforms, the interface between platforms,…
RIS-7016-INS Iss 1.2
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-7700-INS Iss 3
June 2018
Live
- Briefing Notes: 1
- Impact Assessments 1
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 7
June 2025
Withdrawn
- Impact Assessments 2
- Deviations 2
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Permissible speed indicators (km/h)
This document provides design details for AD01k sign - Permissible speed indicators (km/h).
Permissible speed indicators (mph)
This document provides design details for AD01m sign - Permissible speed indicators (mph).
Points identification plates
This document provides design details for AC10 sign - Points identification plates.
Permissible speed indicators (km/h) for limited clearance
This document provides design details for AD02k sign - Permissible speed indicators (km/h) for limited clearance.
Termination of AWS gap
This document provides design details for AA02 sign - Termination of AWS gap.
Commencement of AWS gap
This document provides design details for AA01 sign - Commencement of AWS gap.
Signs at access points - information
This document provides design details for BC01 sign - Signs at access points - information.
Danger from passing trains
This document provides design details for CA01 sign - Danger from passing trains.
Danger - No unauthorised access
This document provides design details for CA03 sign - Danger - no authorised access.
Bridge strike information
This document provides design details for CD02 sign - Bridge strike information.
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.