Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Guidance on wagon maintenance related to recommendations from RAIB reports
This technical note documents findings from all reports, bulletins, and safety digests, published by RAIB, where maintenance of rail wagons has been…
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
Failure of, or work on, signalling equipment - signallers' regulations
You will need this module if you carry out the duties of a signaller.
GERT8000-TS11 Iss 6
December 2024
Withdrawn
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Permissive Working Risk Assessment and Risk Controls
This document sets out the Control, Command and Signalling (CCS) system requirements for authorising a train movement into an occupied section of…
GKRT0044 Iss 3
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 2
GKGN0644 Iss 2
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Driver Controlled Operation (DCO) On-Train Camera/Monitors (OTCM)
This standard sets out requirements for the functions, design and testing of Driver Controlled Operation (DCO) On-Train Camera/Monitor (OTCM) systems…
RIS-2703-RST Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Requirements for Minimum Signalling Braking and Deceleration Distances
This document specifies the Minimum Signalling Braking Distance (MSBD) and Minimum Deceleration Distance (MDD) for lineside signal spacings and the…
GKRT0075 Iss 4
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 4
GKGN0675 Iss 4
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Interface Requirements for Connected Driver Advisory System
This document sets out requirements for the data interfaces between the infrastructure manager (IM) and the railway undertakings (RUs) for an…
Written Order 03 Instruction to Run At Caution Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Written Order 01 Permission To Start In SR Or To Pass An EOA Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Written Order 02 Permission to Proceed After Train Trip Form
This form is dictated by the signaller to the driver of fitted trains, on ERTMS level 2 lines.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.