Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
ETCS Location Marker
This document provides design details for sign AB10 - ETCS location marker.
Permissible speed acceleration indicator
This document provides design details for sign AD06 - Permissible speed acceleration indicator.
Temporary speed restriction termination - Acceleration indicator
This document provides design details for sign AF09 - Temporary speed restriction termination - Acceleration indicator.
Operation of Route- and Line-Proving Trains
This standard sets out a framework to identify the need for, plan, and operate trains for the purposes of route proving on routes that have previously…
Personnel asking for trains to be stopped form
This form is used by signallers to record the details when personnel ask for a line to be blocked for their own protection when going on or near the…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Provision of Signage at Power Changeover Locations
This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.
RIS-3784-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Maintaining the Visibility of Signals and Operational Signs
This document sets out requirements and guidance to ensure that the visibility of signals and operational signs are not adversely affected during the…
RIS-8034-CCS Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Medical Fitness Assessment
This document sets out requirements and guidance for the management of medical fitness assessment for safety critical workers on the GB mainline…
GOGN3655 Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
RIS-3451-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-3452-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Reference Limits for Freight Wagon Defects
This document sets out the criteria for addressing defects in freight wagons arising during operation, and the restrictions on their use that apply.
RIS-2702-RST Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track Machines (OTMs) in running mode.
GMRT2400 Iss 6.2
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
- Deviations 4
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7.1
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
Engineering Design of On-Track Machines in Travelling and Working Modes
This document sets out requirements and guidance for the application of the BS EN 14033:2017 series for on-track Machines (OTMs) in their travelling…
RIS-1702-PLT Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 2
Determination of Aerodynamic Rolling Moment Coefficient
This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…
GMRC2542 Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Amendments: 1
Activation of TPWS or ERTMS tri
This form is used by a signaller to record information obtained from drivers after the activation of TPWS, except when a signal has been passed at…
Form RT3188 02-05
December 2023
Withdrawn
Duties of the COSS and person in charge when using a hand trolley
You will need this handbook if you are the COSS or SWL and person in charge when using a hand trolley.
GERT8000-HB10 Iss 4.1
December 2023
Withdrawn
- Impact Assessments 1
Reporting a signal / AWS / TPWS / ATP / TVM failure or irregularity
For use by drivers in all cases of signal, AWS or TPWS irregularities and signallers when the following is reported: A wrong side signalling failure,…
Form RT3185 Iss 12-15
December 2023
Withdrawn
Advice to Train Crews - Conveyance of Radioactive Flask
This form is a Network Rail maintained document and is provided as a stand-alone version of the form originally reproduced as an Appendix to GORT3407…
Form RT3973-NUC Iss 1
December 2023
Withdrawn
Duties of the person in charge of the siding possession (PICOS)
You will need this handbook if you carry out the duties of a PICOS.
GERT8000-HB13 Iss 3
December 2023
Withdrawn
- Impact Assessments 1
Track circuit block regulations
You will need this module if you carry out the duties of a signaller in a track circuit block area.
Observing and obeying signalling indications. Train warning systems. Reporting signalling failures and irregularities
You will need this module if you carry out the duties of a driver, person controlling train movements, shunter or signaller.
GERT8000-S7 Iss 5
December 2023
Withdrawn
- Impact Assessments 1
Dealing with a train accident or train evacuation
You will need this module if you carry out the duties of a driver, guard or signaller.
GERT8000-M1 Iss 6
December 2023
Withdrawn
- Impact Assessments 1
Train stopped by train failure
You will need this module if you carry out the duties of a driver or signaller.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Code of Practice for Defect Reporting for OTP, Plant and Equipment
This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…
COP0012 Iss 7
December 2024
Withdrawn
Code of Practice for Defective OTP Safety Critical Equipment
This code of practice has been developed to describe the actions to be taken by Plant Lead, Machine/Crane controllers and machine operators in the…
Code of Practice for Load Lifting Points on Road Rail Excavator Cranes
This Code of Practice is intended to provide explanation and guidance to manufacturers, converters, owners and users of road rail excavator cranes…
COP0015 Iss 5
March 2025
Withdrawn
Code of Practice for Lifting Operations Using Manually Propelled Rail Handlers (MPRH)
This Code of Practice details the various minimum requirements for Lifting and handling loads with Manually Propelled Rail Handlers (MPRH). This Code…
COP0030 Iss 2
March 2025
Withdrawn
Code of Practice for Tandem Lifting with Two Excavator Cranes
This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. This Code of Practice…
Code of Practice for Flailing Operations using OTP
This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations. This Code of Practice applies to all…
Code of Practice for Planning for the use of non-rail mounted plant
This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…
COP0028 Iss 1
March 2025
Withdrawn
Code of Practice for Independence and Competence of LOLER Thorough Examiners
This Code of Practice details the various minimum requirements for independence of the examiner for Thorough Examination of lifting equipment and…
COP0029 Iss 1
March 2025
Withdrawn
Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)
This Code of Practice is intended to give guidance for the safe on, off and cross tracking of OTP to mitigate the possibility of derailing or…
COP0007 Iss 7
March 2025
Withdrawn
Code of Practice for Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…