Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
ETCS Location Marker
This document provides design details for sign AB10 - ETCS location marker.
Permissible speed acceleration indicator
This document provides design details for sign AD06 - Permissible speed acceleration indicator.
Temporary speed restriction termination - Acceleration indicator
This document provides design details for sign AF09 - Temporary speed restriction termination - Acceleration indicator.
Operation of Route- and Line-Proving Trains
This standard sets out a framework to identify the need for, plan, and operate trains for the purposes of route proving on routes that have previously…
Personnel asking for trains to be stopped form
This form is used by signallers to record the details when personnel ask for a line to be blocked for their own protection when going on or near the…
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Provision of Signage at Power Changeover Locations
This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.
RIS-3784-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Maintaining the Visibility of Signals and Operational Signs
This document sets out requirements and guidance to ensure that the visibility of signals and operational signs are not adversely affected during the…
RIS-8034-CCS Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Medical Fitness Assessment
This document sets out requirements and guidance for the management of medical fitness assessment for safety critical workers on the GB mainline…
GOGN3655 Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
RIS-3451-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-3452-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Reference Limits for Freight Wagon Defects
This document sets out the criteria for addressing defects in freight wagons arising during operation, and the restrictions on their use that apply.
RIS-2702-RST Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track Machines (OTMs) in running mode.
GMRT2400 Iss 6.2
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
- Deviations 4
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7.1
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
Engineering Design of On-Track Machines in Travelling and Working Modes
This document sets out requirements and guidance for the application of the BS EN 14033:2017 series for on-track Machines (OTMs) in their travelling…
RIS-1702-PLT Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 2
Determination of Aerodynamic Rolling Moment Coefficient
This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…
GMRC2542 Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Amendments: 1
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Changes to National Operations Publications for March 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
AC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trainoperationsstaff Iss 14.1
November 2024
Live Pending Withdrawal
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Document Type
Issue Date
From: To:Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
MEWP Planning
This poster is provided by the M&EE Networking Group to remind industry that all MEWP activities must be properly planned and site specific - even if…
Code of Practice for Route Conductor Assurance
This Code of Practice is to assist Duty Holders to identify, assess and control risks which may arise from the activities of supplying and engaging in…
OTP Tandem Lifting and Indication
This poster is provided by the M&EE Networking Group to remind planners to use the latest planning information/tools provided by the RCI suppliers for…
Lifting Accessories Misuse
This poster is provided by the M&EE Networking Group to remind planners and users of plant about the dangers associated with the misuse of lifting…
Lift and Carry Using OTP In Road Mode
This poster is provided by the M&EE Networking Group to remind the operator of road-rail excavator cranes of the need for caution because lift and…
RCI Motion Cut
This poster is provided by the M&EE Networking Group to remind the industry that the RCI function automatically stops further movement of the machine…
Crane Controller Competence for Twin Jib Cranes
This poster is provided by the M&EE Networking Group to remind industry that when using a twin jib crane under the control of one operator then there…
Using Outriggers / Stabilisers on Plant
This poster is provided by the M&EE Networking Group to reminder planners and users of plant with outriggers that stability can be seriously affected…