Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:GSM-R Handbook
This handbook is intended a guidance to users of the GSM-R system used on the GB mainline railway.
Lineside Signal Aspects and Indications
This document specifies the appearance of lineside signal aspects and indications and the information they convey.
RIS-0758-CCS Iss 1
March 2018
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GKRT0058 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
GKGN0658 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Lineside Signalling Layout Driveability Assessment Requirements
This document sets out requirements for assessing the driveability of lineside signalling systems, and guidance on the process of assessing changes to…
GERT8071 Iss 2
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
GEGN8571 Iss 2
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
GKRT0045 Iss 5
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 8
GKGN0645 Iss 5
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
RIS-0713-CCS Iss 1
March 2018
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
750 V and 1500 V DC Overhead Lines and corresponding Rolling Stock requirements
This document specifies requirements and associated rationale and guidance at the interface between energy subsystems and rolling stock subsystems for…
Magnetic Track Brakes
This document sets out requirements for driver-actuated magnetic track brakes fitted to rail vehicles used on the GB mainline railway.
Train to Infrastructure RFID Compatibility
This document sets out requirements for an RFID system where the tag is on the train and the reader is on the infrastructure. It includes specific…
Guidance on the Use of Escrow Agreements for Rail Applications
This document provides guidance on the use of escrow agreements and is intended to assist in understanding the application of escrow agreements. The…
GEGN8607 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Reporting of Safety Related Information
This document sets out requirements for entering information into the industry's Safety Management Intelligence System (SMIS), and for how that…
RIS-8047-TOM Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4.1
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Application of the Entity in Charge of Maintenance Regulations
This document gives guidance on the application of regulations on entities in charge of maintenance (ECM) with respect to freight wagons that are used…
Verification of Conformity of Engineering Change to Rail Vehicles
The document sets out a process for verification of conformity of engineering change against applicable requirements. This process can be adopted by…
RIS-2700-RST Iss 2
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Technical Notes 3
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 4
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7.1
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
Determination of Aerodynamic Rolling Moment Coefficient
This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…
GMRC2542 Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Amendments: 1
Engineering Design of On-Track Machines in Running Mode
This document sets out requirements for the design of on-track Machines (OTMs) in running mode.
GMRT2400 Iss 6.2
March 2025
Withdrawn
- Briefing Notes: 1
- Technical Notes 2
- Deviations 4
AC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 14.1
June 2025
Withdrawn
List of Dangerous Goods and their United Nations Numbers
You will need this handbook if you need to understand what dangerous goods are, how they are classified and the meaning of their warning signs.
IWA or COSS setting up safe systems of work within possessions
You will need this handbook if you carry out the duties of an IWA or COSS setting up safe systems of work within possessions.
GERT8000-HB9 Iss 8
November 2024
Withdrawn
- Impact Assessments 1
- Deviations 8
General signalling regulations
You will need this module if you carry out the duties of a signaller.
Distant signal sign and identification plate
This document provides design details for AC02 sign - Distant signal sign and identification plate.
Automatic signal sign and identification plate
This document provides design details for AC03 sign - Automatic signal sign and identification plate.
Semi-automatic signal sign and identification plate
This document provides design details for AC04 sign - Semi-automatic signal sign and identification plate.
Intermediate block home signal sign and identification plate
This document provides design details for AC05 sign - Intermediate block home signal sign and identification plate.
CSR alias plate
This document provides design details for AC06 sign - CSR alias plate.
SPAD indicator sign and identification plate
This document provides design details for AC07 sign - SPAD indicator sign and identification plate.
Points indicator sign
This document provides design details for AC08 sign - Points indicator sign.
Ground position light signal identification plate
This document provides design details for AC09 sign - Ground position light signal identification plate.
ETCS identification plate
This document provides design details for AC11 sign - ETCS identification plate.
GSM-R alias plate
This document provides design details for AC12 sign - GSM-R alias plate.
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.