Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:GSM-R Handbook
This handbook is intended a guidance to users of the GSM-R system used on the GB mainline railway.
Lineside Signal Aspects and Indications
This document specifies the appearance of lineside signal aspects and indications and the information they convey.
RIS-0758-CCS Iss 1
March 2018
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GKRT0058 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
GKGN0658 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Lineside Signalling Layout Driveability Assessment Requirements
This document sets out requirements for assessing the driveability of lineside signalling systems, and guidance on the process of assessing changes to…
GERT8071 Iss 2
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
GEGN8571 Iss 2
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
GKRT0045 Iss 5
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 8
GKGN0645 Iss 5
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
RIS-0713-CCS Iss 1
March 2018
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
750 V and 1500 V DC Overhead Lines and corresponding Rolling Stock requirements
This document specifies requirements and associated rationale and guidance at the interface between energy subsystems and rolling stock subsystems for…
Magnetic Track Brakes
This document sets out requirements for driver-actuated magnetic track brakes fitted to rail vehicles used on the GB mainline railway.
Train to Infrastructure RFID Compatibility
This document sets out requirements for an RFID system where the tag is on the train and the reader is on the infrastructure. It includes specific…
Guidance on the Use of Escrow Agreements for Rail Applications
This document provides guidance on the use of escrow agreements and is intended to assist in understanding the application of escrow agreements. The…
GEGN8607 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Reporting of Safety Related Information
This document sets out requirements for entering information into the industry's Safety Management Intelligence System (SMIS), and for how that…
RIS-8047-TOM Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Application of the WAG NTSN and NOI NTSN to the Design of Freight Wagons
This document provides guidance on the application of the Rolling Stock - Freight Wagon National Technical Specification Notice (WAG NTSN) and on the…
GMGN2688 Iss 2
June 2024
Withdrawn
- Briefing Notes: 1
- Amendments: 3
- Technical Notes 2
NDT Processes on Rail Vehicles
This document sets out requirements and gives guidance for processes and the certification of operatives, equipment, and facilities used to undertake…
RIS-2701-RST Iss 1
June 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rail Industry Guidance Note on Vehicle Static Testing
This document gives guidance on meeting the requirements of GMRT2141 'Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway…
GMGN2641 Iss 1
June 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Route Availability
This technical note describes the standards associated with rail vehicle route availability (RA) numbers, and provides guidance on the application of…
Route Availability Number for Assessment of Compatibility between Rail Vehicles and Underline Bridges
This document sets out requirements for the derivation and use of the Route Availability number for the assessment of compatibility between the static…
GERT8006 Iss 3
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Permissible Track Forces and Resistance to Derailment and Roll-Over of Railway Vehicles
This document sets out requirements for railway vehicles regarding permissible track forces, derailment resistance and resistance to roll-over due to…
GMRT2141 Iss 4.1
September 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Deviations 2
Route Level Assessment of Technical Compatibility between Rail Vehicles and Underline Bridges
This document sets out requirements and guidance for the assessment of compatibility between rail vehicles and underline bridges at route level on the…
RIS-8706-INS Iss 1
June 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance on evaluating excessive dynamic effects in underline bridges
This document provides guidance on evaluating and managing the risk of excessive dynamic effects in underline bridges resulting from the operating…
Fire safety of refurbished passenger seats
This technical note provides guidance on the application of fire standards to existing vehicles undergoing refurbishment which affects passenger…
Public address interface to GSM-R
This technical note will help industry to determine GSM-R cab radio public address announcement priorities when integrated with the onboard public…
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 7
June 2025
Withdrawn
- Impact Assessments 2
- Deviations 2
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Temporary speed restriction warning boards (km/h)
This document provides design details for AF02k sign - Temporary speed restriction warning boards (km/h).
Temporary speed restriction warning boards (mph)
This document provides design details for AF02m sign - Temporary speed restriction warning boards (mph).
Temporary speed restriction speed indicators (km/h)
This document provides design details for AF04k sign - Temporary speed restriction speed indicators (km/h).
Permissible speed warning indicators (km/h) for limited clearance
This document provides design details for AD04k sign - Permissible speed warning indicators (km/h) for limited clearance.
Temporary speed restriction speed indicator (mph)
This document provides design details for AF04m sign - Temporary speed restriction speed indicator (mph).
Permissible speed warning indicators (mph)
This document provides design details for AD03m sign - Permissible speed warning indicators (mph).
Permissible speed warning indicators (km/h)
This document provides design details for AD03k sign - Permissible speed warning indicators (km/h).
Permissible speed indicators (mph) for limited clearance
this document provides design details for AD02m sign - Permissible speed indicators (mph) for limited clearance.
Termination of special AWS working
This document provides design details for AA04 sign - Termination of special AWS working.
Commencement of special AWS working
This document provides design details for AA03 sign - Commencement of special AWS.
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.