Menu
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:

Withdrawn
Issue Date: December 2017
Withdrawn
Issue Date: December 2017
Live
Issue Date: September 2017

Arrangements Concerning the Non-Operation of Track Circuits During the Leaf Fall Contamination Period

This document details the requirements for identifying the need for, introduction and subsequent removal of, restrictions to normal operations to…

Arrangements Concerning the Non-Operation of Track Circuits During the Leaf Fall Contamination Period
RIS-3708-TOM Iss 1
September 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 2
Live
Issue Date: September 2017

ERTMS/ETCS National Values

This Rail Industry Strandard (RIS) contains requirements and guidance for a process to determine or revise a set of values of ERTMS/ETCS National…

ERTMS / ETCS National Values
GERT8408 Iss 1
December 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 2
Guidance on ERTMS / ETCS National Values
GEGN8608 Iss 1
December 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Live
Issue Date: September 2017

Ground Frames and Shunters' Releases

This document sets out the interface requirements for ground frames and shunters' releases that may be operated by railway undertaking personnel.

Ground Frames and Shunters' Releases
GKRT0077 Iss 1
December 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 2
  • Deviations 2
Guidance on Ground Frames and Shunters' Releases
GKGN0677 Iss 1
December 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 2
Live
Issue Date: September 2017

Guidance on the Operation and Traffic Management Technical Specification for Interoperability

This document provides guidance on interpretation of points within the Operation and Traffic Management TSI (OPE TSI) where, owing to incomplete or…

Live
Issue Date: September 2017

Duties of the machine controller (MC) and on-track plant operator on ERTMS lines where lineside signals are not provided

You will need this handbook if you carry out the duties of the machine controller (MC) and on-track plant operator on ERTMS lines.

Duties of the machine controller (MC) and on-track plant operator on ERTMS lines where lineside signals are not provided
GERT8000-HB15 ERTMS Iss 2
December 2017
Withdrawn
  • Impact Assessments 1
  • Amendments: 1
Live
Issue Date: September 2017

Identification of Signalling and Related Equipment

This document sets out the principles for ensuring that signalling and related assets are uniquely identified.

Guidance on Identification of Signalling and Related Equipment
GKGN0609 Iss 1
December 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Identification of Signalling and Related Equipment
GKRT0009 Iss 4
December 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 2
Live
Issue Date: September 2017

Tilting Trains: Controlling Tilt Systems to Maintain Clearances

This document sets out the means by which Tilting Trains are permitted to utilise the tilt mechanism over routes, parts of which contain sections…

Recommendations for Systems for the Supervision of Enhanced Permissible Speeds and Tilt Enable
GERC8517 Iss 1
December 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 1
Tilting Trains: Controlling Tilt Systems to Maintain Clearances
GERT8019 Iss 1
December 2017
Withdrawn
  • Briefing Notes: 2
  • Impact Assessments 2
  • Deviations 3
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: May 2025

Crashworthiness risk assessment for mainline passenger rolling stock

This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…

Live
Issue Date: April 2025

Onboard passenger air quality improvement

This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…

Live
Issue Date: March 2025

Overrun Risk Evaluation and Assessment

This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority. 

Live
Issue Date: March 2025

Provision of Signage at Power Changeover Locations

This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.

Provision of Signage at Power Changeover Locations
RIS-3784-TOM Iss 1
March 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: March 2025

Maintaining the Visibility of Signals and Operational Signs

This document sets out requirements and guidance to ensure that the visibility of signals and operational signs are not adversely affected during the…

Maintenance of Signal and Operational Sign Visibility
RIS-8034-CCS Iss 1
March 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: March 2025

Medical Fitness Assessment

This document sets out requirements and guidance for the management of medical fitness assessment for safety critical workers on the GB mainline…

Guidance on Medical Fitness for Railway Safety Critical Workers
GOGN3655 Iss 2
March 2025
Withdrawn
  • Briefing Notes: 1
Train Drivers - Suitability and Medical Fitness Requirements
RIS-3451-TOM Iss 1
March 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Train Movement - Medical Fitness Requirements
RIS-3452-TOM Iss 1
March 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: March 2025

Lineside Operational Signs

This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB catalogue. It also…

Lineside Operational Signs
RIS-0733-CCS Iss 1.2
March 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: March 2025

Determination of Aerodynamic Rolling Moment Coefficient

This Guidance Note provides guidance to railway undertakings and infrastructure managers for methods of undertaking wind tunnel tests to determine…

Recommendations for Determination of Aerodynamic Rolling Moment Coefficient
GMRC2542 Iss 1
March 2025
Withdrawn
  • Briefing Notes: 1
  • Amendments: 1
Live
Issue Date: March 2025

Reference Limits for Freight Wagon Defects

This document sets out the criteria for addressing defects in freight wagons arising during operation, and the restrictions on their use that apply.

In-Service Examination and Reference Limits for Freight Wagons
RIS-2702-RST Iss 2
March 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 1
Live
Issue Date: March 2025

Requirements for the operation of freight trains and the conveyance of dangerous goods by any train

This document sets out requirements and guidance relating to the safe operation of freight trains and the safe movement of dangerous goods.

Requirements for the operation of freight trains and the conveyance of dangerous goods by any train
RIS-3781-TOM Iss 1
March 2025
Withdrawn
  • Briefing Notes: 1
  • Impact Assessments 2
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Sort By:
Results per page:

Live
Issue Date: September 2024

Speeds

You will need this module if you carry out the duties of a driver, signaller or train preparer.

Speeds
GERT8000-SP Iss 6
December 2024
Withdrawn
  • Impact Assessments 1
  • Deviations 3
Live
Issue Date: September 2024

Wrong-direction movements

You will need this module if you carry out the duties of a driver or signaller.

Wrong-direction movements
GERT8000-TW7 Iss 9
December 2024
Withdrawn
  • Impact Assessments 1
  • Deviations 5
Live
Issue Date: September 2024

Duties of the person in charge of the possession (PICOP)

You will need this handbook if you carry out the duties of the PICOP.

Duties of the person in charge of the possession (PICOP)
GERT8000-HB11 Iss 10
December 2024
Withdrawn
  • Impact Assessments 1
  • Deviations 15
Live
Issue Date: September 2024

Duties of the engineering supervisor (ES) in a possession

You will need this handbook if you carry out the duties of the ES in a possession.

Duties of the engineering supervisor (ES) or safe work leader (SWL) in a possession
GERT8000-HB12 Iss 9
December 2024
Withdrawn
  • Impact Assessments 1
  • Deviations 17
Live
Issue Date: September 2024

Working of on-track machines (OTM)

You will need this module if you carry out the duties of a driver of an on-track machine, an operator of an on-track machine or a signaller.

Working of on-track machines (OTM)
GERT8000-OTM Iss 11
December 2024
Withdrawn
  • Impact Assessments 1
Live Pending Withdrawal
Issue Date: September 2024

Rule Book Handbook Issue History

This document contains updates to align with changes to Rule Book handbook issues (GERT8000)

Rule Book Handbook Issue History
GERT8000 Issue HB Iss 17
December 2024
Withdrawn
Live Pending Withdrawal
Issue Date: September 2024

Rule Book Module Issue History

This document contains updates to align with changes to Rule Book module issues (GERT8000)

Rule Book Module Issue History
GERT8000 Issue Iss 36
December 2024
Withdrawn
Live Pending Withdrawal
Issue Date: September 2024

Signals, Handsignals, Indicators and Signs Handbook

You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.

Signals, Handsignals, Indicators and Signs Handbook
RS521 Iss 6
December 2024
Withdrawn
  • Impact Assessments 1
  • Deviations 1
Withdrawn
Issue Date: September 2024
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)
Showing for
Applied filters: What's New (x) Vehicle Assessment (x) Archived Documents (x) Live (x) In Preparation (x) Live Pending Withdrawal (x) Pending (x) Withdrawn (x) Control Command and Signalling - CCS (x) Data, Systems and Telematics Standards Committee - DST (x) Energy - ENE (x) Infrastructure - INS (x) Plant - PLT (x) Rolling Stock - RST (x) Traffic Operation and Management - TOM (x) Rail Delivery Group - RDG (x) Amendments (x) Briefing Leaflet (x) Changes to National Operations Publications (GERT8001) (x) Pink Pages (GORT3053) (x) Pre-modular Rule Book (GORT3000) (x) RS Handbooks (x) RB Form (x) Rule Book Handbook (x) Manual (x) White pages (GORT3056) (x) Electrified lines (AC) (x) Electrified lines (DC) (x) ERTMS (x) Glossary (x) GSM-R (x) Index (x) Issue History (x) Mishaps incidents and extreme weather (M) (x) On-track machines (OTM) (x) On-track plant (OTP) (x) Personal safety and general responsibilities (G) (x) Proceed-on-Sight Authority (PoSA) (x) Signals (S) (x) Speed and restrictions (SP) (x) Station working and shunting (SS) (x) Track and signalling work (T) (x) Train signalling (TS) (x) Train working (TW) (x) Working by pilotman (P) (x) Approach to Level Crossings Signs (x) Communications Signs (x) Electrical Traction Signs (x) Geographically Specific Signs (x) Identification Signs (x) Limits for Engineering Possession Signs (x) Miscellaneous Signs (x) Speed Signs (x) Train Protection Signs (x) Infrastructure Managers Signs (x) Signs for the Public (x) Railway Group Standard (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Manual (x) Other (x) Rail Industry Standard (x) Standards Forms (x) Technical note (x) Code of Practice (x) Poster (x) Code of Practice (x) Good Practice Guide (x) Guidance Note (x) Vehicle Interior (x) Issue 3 (x) Issue 4 (x) Clear date filter (x)

Issue Date

From: To:
Sort By:
Results per page:

Live
Issue Date: December 2024

Code of Practice for Defect Reporting for OTP, Plant and Equipment

This Code of Practice details the systems to have in place so that all safety related defects are reported and that other reported defects are checked…

Live
Issue Date: December 2024

Code of Practice for Defective OTP Safety Critical Equipment

This code of practice has been developed to describe the actions to be taken by Plant Lead, Machine/Crane controllers and machine operators in the…

Live
Issue Date: November 2024

Code of Practice for Load Lifting Points on Road Rail Excavator Cranes

This Code of Practice is intended to provide explanation and guidance to manufacturers, converters, owners and users of road rail excavator cranes…

Live
Issue Date: November 2024

Code of Practice for Lifting Operations Using Manually Propelled Rail Handlers (MPRH)

This Code of Practice details the various minimum requirements for Lifting and handling loads with Manually Propelled Rail Handlers (MPRH). This Code…

Live
Issue Date: November 2024

Code of Practice for Tandem Lifting with Two Excavator Cranes

This Code of Practice details the control measures to be applied when using two excavator cranes to lift a load simultaneously. This Code of Practice…

Live
Issue Date: November 2024

Code of Practice for Flailing Operations using OTP

This Code of Practice details the actions to be taken, when planning for, and undertaking flailing operations. This Code of Practice applies to all…

Code of Practice for Flailing Operations using OTP
COP0026 Iss 3
March 2025
Withdrawn
Live
Issue Date: November 2024

Code of Practice for Planning for the use of non-rail mounted plant

This Code of Practice details minimum requirements for planning and mitigating the risks when delivering work using non rail mounted plant that could…

Live
Issue Date: November 2024

Code of Practice for Independence and Competence of LOLER Thorough Examiners

This Code of Practice details the various minimum requirements for independence of the examiner for Thorough Examination of lifting equipment and…

Live
Issue Date: November 2024

Code of Practice for On, Off and Cross Tracking of On Track Plant (OTP)

This Code of Practice is intended to give guidance for the safe on, off and cross tracking of OTP to mitigate the possibility of derailing or…

Live
Issue Date: July 2024

Code of Practice for Piling using OTP

This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…

Code of Practice for Piling using OTP
COP0034 Iss 1
September 2024
Withdrawn