Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Ground Frames and Shunters' Releases
This document sets out the interface requirements for ground frames and shunters' releases that may be operated by railway undertaking personnel.
GKRT0077 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 2
GKGN0677 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Guidance on the Operation and Traffic Management Technical Specification for Interoperability
This document provides guidance on interpretation of points within the Operation and Traffic Management TSI (OPE TSI) where, owing to incomplete or…
GOGN3615 Iss 1
September 2017
Withdrawn
- Briefing Notes: 2
Duties of the machine controller (MC) and on-track plant operator on ERTMS lines where lineside signals are not provided
You will need this handbook if you carry out the duties of the machine controller (MC) and on-track plant operator on ERTMS lines.
GERT8000-HB15 ERTMS Iss 2
December 2017
Withdrawn
- Impact Assessments 1
- Amendments: 1
Identification of Signalling and Related Equipment
This document sets out the principles for ensuring that signalling and related assets are uniquely identified.
GKGN0609 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GKRT0009 Iss 4
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Tilting Trains: Controlling Tilt Systems to Maintain Clearances
This document sets out the means by which Tilting Trains are permitted to utilise the tilt mechanism over routes, parts of which contain sections…
GERC8517 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GERT8019 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
Controlling the Speed of Tilting Trains through Curves
This document sets out the means by which tilting trains may be operated at higher speeds than non-tilting trains around curves.
GERC8517 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
GERT8012 Iss 1
December 2017
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
- Deviations 2
Engineering Requirements for Dispatch of Trains from Platforms
This document sets out the minimum engineering requirements for the facilities used in dispatching trains from platforms.
GERT8060 Iss 2
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
GEGN8560 Iss 1
December 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Engineering Design of On-Track Machines in Travelling and Working Modes
This document sets out requirements and guidance for the application of the BS EN 14033:2017 series for on-track Machines (OTMs) in their travelling…
RIS-1702-PLT Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 2
Medical Fitness Assessment
This document sets out requirements and guidance for the management of medical fitness assessment for safety critical workers on the GB mainline…
GOGN3655 Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
RIS-3451-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-3452-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Reference Limits for Freight Wagon Defects
This document sets out the criteria for addressing defects in freight wagons arising during operation, and the restrictions on their use that apply.
RIS-2702-RST Iss 2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Lineside Operational Signs
This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB catalogue. It also…
RIS-0733-CCS Iss 1.2
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Provision of Signage at Power Changeover Locations
This document sets out requirements and guidance for provision of signage at power changeover locations for multi-mode rolling stock.
RIS-3784-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Requirements for the operation of freight trains and the conveyance of dangerous goods by any train
This document sets out requirements and guidance relating to the safe operation of freight trains and the safe movement of dangerous goods.
RIS-3781-TOM Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Maintaining the Visibility of Signals and Operational Signs
This document sets out requirements and guidance to ensure that the visibility of signals and operational signs are not adversely affected during the…
RIS-8034-CCS Iss 1
March 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Junction signal sighting
This technical note has been issued to help the industry manage the sighting of colour light junction signals. This document is responding to the RAIB…
TPWS receiver aerial location
This technical note will help industry identify the risks associated with mounting the Train Protection and Warning System (TPWS) receiver aerial…
Psychometric Assessment in Train Driver Selection
This document sets out requirements and guidance on the psychometric assessment used during the selection process for train driver candidates who will…
RIS-3751-TOM Iss 3
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
AC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
AC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an AC electrified area to carry out their duties, with the exception…
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 14.1
June 2025
Withdrawn
List of Dangerous Goods and their United Nations Numbers
You will need this handbook if you need to understand what dangerous goods are, how they are classified and the meaning of their warning signs.
IWA or COSS setting up safe systems of work within possessions
You will need this handbook if you carry out the duties of an IWA or COSS setting up safe systems of work within possessions.
GERT8000-HB9 Iss 8
November 2024
Withdrawn
- Impact Assessments 1
- Deviations 8
General signalling regulations
You will need this module if you carry out the duties of a signaller.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.