Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Failure of, or work on, signalling equipment - signallers' regulations
You will need this module if you carry out the duties of a signaller.
GERT8000-TS11 Iss 6
December 2024
Withdrawn
- Impact Assessments 1
General duties of an individual working alone (IWA)
This handbook is for those personnel with general duties of an individual working alone (IWA).
GERT8000-HB6 Iss 7
December 2024
Withdrawn
- Impact Assessments 1
- Deviations 1
General duties of a controller of site safety (COSS)
This handbook is for those personnel who have the general duties of a controller of site safety (COSS).
GERT8000-HB7 Iss 8
December 2024
Withdrawn
- Impact Assessments 1
- Deviations 11
Duties of the machine controller (MC) and on-track plant operator
You will need this handbook if you carry out the duties of the machine controller (MC) and on-track plant operator.
GERT8000-HB15 Iss 6
December 2024
Withdrawn
- Impact Assessments 1
Defective or isolated vehicles and on-train equipment
You will need this module if you carry out the duties of a driver, guard, signaller or train preparer. It sets out the operational instructions to be…
GERT8000-TW5 Iss 12
December 2024
Withdrawn
- Impact Assessments 1
- Technical Notes 2
Personnel asking for trains to be stopped form
This form is used by signallers to record the details when personnel ask for a line to be blocked for their own protection when going on or near the…
Operation of Route- and Line-Proving Trains
This standard sets out a framework to identify the need for, plan, and operate trains for the purposes of route proving on routes that have previously…
Level crossings - signallers' regulations
You will need this module if you carry out the duties of a signaller in an area where there is a level crossing.
GERT8000-TS9 Iss 4.1
December 2024
Withdrawn
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Lineside Signal Aspects and Indications
This document specifies the appearance of lineside signal aspects and indications and the information they convey.
RIS-0758-CCS Iss 1
March 2018
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GKRT0058 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
GKGN0658 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Lineside Signalling Layout Driveability Assessment Requirements
This document sets out requirements for assessing the driveability of lineside signalling systems, and guidance on the process of assessing changes to…
GERT8071 Iss 2
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
GEGN8571 Iss 2
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
GKRT0045 Iss 5
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 8
GKGN0645 Iss 5
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
RIS-0713-CCS Iss 1
March 2018
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
750 V and 1500 V DC Overhead Lines and corresponding Rolling Stock requirements
This document specifies requirements and associated rationale and guidance at the interface between energy subsystems and rolling stock subsystems for…
Magnetic Track Brakes
This document sets out requirements for driver-actuated magnetic track brakes fitted to rail vehicles used on the GB mainline railway.
Train to Infrastructure RFID Compatibility
This document sets out requirements for an RFID system where the tag is on the train and the reader is on the infrastructure. It includes specific…
Guidance on the Use of Escrow Agreements for Rail Applications
This document provides guidance on the use of escrow agreements and is intended to assist in understanding the application of escrow agreements. The…
GEGN8607 Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Reporting of Safety Related Information
This document sets out requirements for entering information into the industry's Safety Management Intelligence System (SMIS), and for how that…
RIS-8047-TOM Iss 1
March 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 7
June 2025
Withdrawn
- Impact Assessments 2
- Deviations 2
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).