Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Low Voltage Power Supplies in Electrified Areas
This document includes requirements for earthing, bonding and the control of traction currents in low voltage power supplies in areas of the GB…
GLRT1255 Iss 1
June 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
ERTMS Key Management
This document contains requirements for the management of cryptographic keys on the mainline railway to facilitate secure European Rail Traffic…
GEGN8603 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Guidance on the Energy TSI
This document gives guidance on interpreting the requirements of the Energy Technical Specification for Interoperability 2014 (ENE TSI) Commission…
GEGN8600 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Amendments: 1
GSM-R Train Voice Radio Systems
This document sets out the requirements for the application of GSM-R train voice radio systems, specifically interface requirements for the…
RIS-0794-CCS Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
GKRT0094 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 3
GKGN0694 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Functioning and Control of Exterior Doors on Passenger Vehicles
This document provides GB requirements for exterior doors and Selective Door Operation (SDO) systems.
GMRT2473 Iss 2
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Deviations 14
GEGN8577 Iss 3
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:TPWS receiver aerial location
This technical note will help industry identify the risks associated with mounting the Train Protection and Warning System (TPWS) receiver aerial…
Guidance on the Common Safety Method for Risk Evaluation and Assessment
This document gives guidance on application of the principles in the Common Safety Method for Risk Assessment and Evaluation.
GEGN8646 Iss 1
December 2024
Withdrawn
- Briefing Notes: 1
Identification of roller bearing defects
This document sets out requirements and guidance for the identification and recording of roller bearing defects at overhaul, for taper, cylindrical…
RIS-2709-RST Iss 1
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Level Crossing Systems
This document sets out requirements for level crossing systems and guidance on the application of controls to mitigate the risk of collision of a…
RIS-0792-CCS Iss 1
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Wheelsets handling and storage
This document sets out requirements and guidance for the handling and storage of wheelsets and their components.
RIS-2704-RST Iss 1
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Time and Date in Railway Systems
This document sets out requirements and guidance for the use, interpretation and formatting of time and date information in railway systems.
Psychometric Assessment in Train Driver Selection
This document sets out requirements and guidance on the psychometric assessment used during the selection process for train driver candidates who will…
RIS-3751-TOM Iss 3
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance on wagon maintenance related to recommendations from RAIB reports
This technical note documents findings from all reports, bulletins, and safety digests, published by RAIB, where maintenance of rail wagons has been…
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
Rule Book Handbook Issue History
This document contains updates to align with changes to Rule Book handbook issues (GERT8000).
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 7
June 2025
Withdrawn
- Impact Assessments 2
- Deviations 2
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
White diamond
This document provides design details for DA02 sign - White diamond.
Signal post telephone
This document provides design details for DB01 sign - Signal post telephone.
Lineside telephone
This document provides design details for DB03 sign - Lineside telephone.
Telephone for routine use by railway staff
This document provides design details for DB06 sign - Telephone for routine use by railway staff.
Cab secure radio channel change marker
This document provides design details for DC02 sign - Cab secure radio channel change marker.
RETB channel change marker
This document provides design details for DC04 sign - RETB channel change marker.
Entering and leaving an IVRS zone marker
This document provides design details for DC06 sign - Entering and leaving an IVRS zone marker.
GSM-R signal box phone number sign
This document provides design details for DD02 sign - GSM-R signal box phone number.
Deviation for countdown markers
This document provides design details for DEV-AK102-01 sign - Deviation for station approach countdown markers Applicable to the South West Trains…
Limited clearance sign
This document provides design details for BA04 sign - Limited clearance sign.
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.