Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Level crossings - drivers' instructions
You will need this module if you carry out the duties of a driver.
GERT8000-TW8 Iss 9.1
December 2024
Withdrawn
- Impact Assessments 1
IWA, COSS or PC blocking a line
You will need this handbook if you carry out the duties of a IWA, COSS or PC blocking a line.
GERT8000-HB8 Iss 9
December 2024
Withdrawn
- Impact Assessments 1
- Deviations 1
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11.1
December 2024
Withdrawn
- Deviations 5
Passing a signal at danger or an end of authority (EoA) without a movement authority (MA)
You will need this module if you carry out the duties of a: driver, guard, shunter or signaller. You will also need this module if you carry out the…
GERT8000-S5 Iss 11
December 2024
Withdrawn
- Impact Assessments 1
Wrong-direction movements
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-TW7 Iss 9
December 2024
Withdrawn
- Impact Assessments 1
- Deviations 5
Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 10
December 2024
Withdrawn
- Impact Assessments 1
- Deviations 15
Duties of the engineering supervisor (ES) in a possession
You will need this handbook if you carry out the duties of the ES in a possession.
GERT8000-HB12 Iss 9
December 2024
Withdrawn
- Impact Assessments 1
- Deviations 17
ETCS Location Marker
This document provides design details for sign AB10 - ETCS location marker.
Permissible speed acceleration indicator
This document provides design details for sign AD06 - Permissible speed acceleration indicator.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Guidance Note on the Management of Electrical Risk Related to Operational Tasks on Electrified Lines
This document provides railway undertakings and infrastructure managers (station operators) with guidance on the management and assessment of…
Provisional ERTMS SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the RT3119 designated Provisional SPAD Data Collection forms when investigating signals…
Form RT3119-D Iss 3
December 2021
Withdrawn
Provisional SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the GORT3119 designated Provisional SPAD Data Collection forms when investigating signals…
Form RT3119-B Iss 8
December 2021
Withdrawn
Supplier Assurance
This document is a standard for the generation of supplier assurance during the procurement cycle for products and services, for use in the GB rail…
RIS-2750-RST Iss 1
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Data Recorders on Trains
This document sets out engineering requirements and guidance for the provision and functionality of data recorders on trains.
RIS-2472-RST Iss 1
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Modified Working Arrangements Driver's Ticket
This form has been revised to come in line with the New Approach. This form is issued by the signaller to drivers and records the details for the…
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.