Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Wheelsets handling and storage
This document sets out requirements and guidance for the handling and storage of wheelsets and their components.
RIS-2704-RST Iss 1
December 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance on wagon maintenance related to recommendations from RAIB reports
This technical note documents findings from all reports, bulletins, and safety digests, published by RAIB, where maintenance of rail wagons has been…
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
Operation of Route- and Line-Proving Trains
This standard sets out a framework to identify the need for, plan, and operate trains for the purposes of route proving on routes that have previously…
Rolling Stock Electromagnetic Compatibility with Trackside CCS Subsystems
This document gives guidance on achieving rolling stock electromagnetic compatibility with control, command and signalling (CCS) subsystems, through…
Rail Traffic Loading Requirements for the Design of Railway Structures
GCGN5612 gives guidance on the background and application of the rail traffic loading requirements for the design of railway structures set out in BS…
GCGN5612 Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Signing of Permissible Speeds
This document sets out requirements, rationale and guidance for signing of permissible speeds applicable to trains operated on the Great Britain (GB)…
RIS-0734-CCS Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Signing of Temporary and Emergency Speed Restrictions
This document sets out requirements, rationale and guidance for signing of Temporary Speed Restrictions (TSRs) and Emergency Speed Restrictions (ESRs)…
RIS-0735-CCS Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Tokenless block regulations
You will need this module if you carry out the duties of a signaller in a tokenless block area.
No-signaller token regulations
You will need this module if you carry out the duties of a signaller in a no-signaller token area. You will also need module TS8 One-train working…
One-train working regulations
You will need this module if you carry out the duties of a signaller in a one-train working area, whether or not a train staff is provided, and a…
Possession of an ERTMS running line for engineering work where lineside signals are not provided
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 ERTMS Iss 4
December 2022
Withdrawn
- Impact Assessments 1
Absolute block regulations
You will need this module if you carry out the duties of a signaller in an absolute block area.
GERT8000-TS3 Iss 7
December 2022
Withdrawn
- Impact Assessments 1
- Deviations 3
General safety responsibilities and personal track safety for non-trackworkers
You will need this module if you carry out the duties of: • a train driver • a guard • a shunter • a designated person (DP) • a signaller • a crossing…
GERT8000-G1 Iss 9
December 2022
Withdrawn
- Impact Assessments 1
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Code of Practice for Loose Materials on OTMs
This Code of Practice details the action to be taken to safely store loose material on an on-track machine.
Code of Practice for Planning and Executing Lifting Operations
This Code of Practice concerns all lifting operations involving rail cranes, twin jib cranes, road-rail excavator cranes, and vehicle mounted knuckle…
COP0011 Iss 5
December 2020
Withdrawn