Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Electromagnetic Compatibility of Train Detection Infrastructure with Rail Vehicles
RIS-0725-CCS Iss 1.1 is a rail industry standard correction release on immunity levels of infrastructure-based train detection systems, to provide…
RIS-0725-CCS Iss 1
April 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rail Industry Standard on Control of Mobile communication Equipment use in Driving Cabs
This document contains requirements and guidance for the control of mobile communication equipment use in the driving cabs of trains.
RIS-3776-TOM Iss 1
March 2019
Withdrawn
- Briefing Notes: 1
Hauling Unbraked Fixed Formations in Freight Trains
This document gives guidance on the braking requirements for hauling unbraked multiple units and other fixed formations in a freight train. This…
GMGN2607 Iss 1
March 2019
Withdrawn
- Briefing Notes: 1
Engineering Certification of Railborne Plant and the Assessment of Non-Railborne Plant
This document is the industry agreed standard for the certification of railborne plant and the assessment of non-railborne plant. It provides an…
RIS-1710-PLT Iss 2
March 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Internet Access on Trains for Customer and Operational Railway Purposes
This document is intended to assist in the procurement of system and services to enable Internet access on trains, and suppliers in pre-empting the…
RIS-0700-CCS Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Interface Requirements for Connected Driver Advisory System
This document sets out requirements for the data interfaces between the infrastructure manager (IM) and the railway undertakings (RUs) for an…
Requirements for Minimum Signalling Braking and Deceleration Distances
This document specifies the Minimum Signalling Braking Distance (MSBD) and Minimum Deceleration Distance (MDD) for lineside signal spacings and the…
GKRT0075 Iss 4
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 4
GKGN0675 Iss 4
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Permissive Working Risk Assessment and Risk Controls
This document sets out the Control, Command and Signalling (CCS) system requirements for authorising a train movement into an occupied section of…
GKRT0044 Iss 3
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 3
- Deviations 2
GKGN0644 Iss 2
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Driver Controlled Operation (DCO) On-Train Camera/Monitors (OTCM)
This standard sets out requirements for the functions, design and testing of Driver Controlled Operation (DCO) On-Train Camera/Monitor (OTCM) systems…
RIS-2703-RST Iss 1
December 2018
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
MEWP Planning
This poster is provided by the M&EE Networking Group to remind industry that all MEWP activities must be properly planned and site specific - even if…
Code of Practice for Route Conductor Assurance
This Code of Practice is to assist Duty Holders to identify, assess and control risks which may arise from the activities of supplying and engaging in…
OTP Tandem Lifting and Indication
This poster is provided by the M&EE Networking Group to remind planners to use the latest planning information/tools provided by the RCI suppliers for…
Lifting Accessories Misuse
This poster is provided by the M&EE Networking Group to remind planners and users of plant about the dangers associated with the misuse of lifting…
Lift and Carry Using OTP In Road Mode
This poster is provided by the M&EE Networking Group to remind the operator of road-rail excavator cranes of the need for caution because lift and…
RCI Motion Cut
This poster is provided by the M&EE Networking Group to remind the industry that the RCI function automatically stops further movement of the machine…
Crane Controller Competence for Twin Jib Cranes
This poster is provided by the M&EE Networking Group to remind industry that when using a twin jib crane under the control of one operator then there…
Using Outriggers / Stabilisers on Plant
This poster is provided by the M&EE Networking Group to reminder planners and users of plant with outriggers that stability can be seriously affected…