Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Switches and Crossings
This document sets out requirements and guidance for new, renewed, and upgraded switches and crossings (S&C) to provide for identification and safe…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Rolling stock – cyber security essentials
This technical note will help industry to identify cyber security control measures, which may be put in place when designing a new component or…
Driver-controlled operation and driver-only operation on-train camera monitoring systems
This technical note will help industry in the design and operation of on-train camera monitoring systems. It provides guidance on the applicable…
Signalling layout and signal aspect sequence requirements
This document sets out requirements for the lineside signalling system to be compatible with train operations and guidance on their application.
RIS-0703-CCS Iss 1.1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
- Amendments: 1
- Deviations 1
Engineering Requirements for Steam Locomotives and other Heritage Rail Vehicles
This document sets out the engineering requirements for heritage rail vehicles (including steam locomotives) to support use when operating in heritage…
RIS-4472-RST Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Management of Control Command and Signalling (CCS) Subsystem Failures, Faults and Defects
This document sets out the management process requirements that apply to safety related failures of control command and signalling (CCS) onboard and…
RIS-0707-CCS Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Technical Notes 1
Track to Train RFID Compatibility
This document sets out requirements for RFID compatibility between train and track, including management of application codes.
Operational Requirements for GSM-R Radio
This document contains the necessary requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system.…
RIS-3780-TOM Iss 1
September 2023
Withdrawn
- Impact Assessments 1
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Use of warning horn
This poster is provided by the M&EE Networking Group to remind the industry about the use of the warning horn.
Code of Practice Protection of Non PTS Holders at OTM Stabling Points
This Code of Practice concerns all OTM stabling points and can be used when non PTS holders need to visit site. The document has been written to…
Code of Practice for Use and Loading of MEWPs
This Code of Practice details the use of MEWPs, particularly with processes for loads that should safely be permitted in the work platform of a MEWP.…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Code of Practice for Action to be Taken in the Event of an Accident or Incident Involving OTP
This Code of Practice details the actions to be taken, and by whom, following an accident or incident involving OTP. It deals with the engineering…
COP0019 Iss 5
June 2022
Withdrawn
Code of Practice for Management of Points within Engineering Work Sites
This Code of Practice is to provide guidance on the arrangements for the Management of Points within Engineering Worksites for all rail borne vehicles…
COP0036 Iss 1
June 2022
Withdrawn
Pulling Rail with Road-Rail Excavator Cranes
This Code of Practice provides good practice in the safe pulling of continuous welded rail (CWR) and to minimise the risk of damage to the CWR or…