Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4.1
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Application of the Entity in Charge of Maintenance Regulations
This document gives guidance on the application of regulations on entities in charge of maintenance (ECM) with respect to freight wagons that are used…
Verification of Conformity of Engineering Change to Rail Vehicles
The document sets out a process for verification of conformity of engineering change against applicable requirements. This process can be adopted by…
RIS-2700-RST Iss 2
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Technical Notes 3
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 4
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:High Visibility Clothing
This document sets out the minimum requirements for high-visibility clothing.
RIS-3279-TOM Iss 1
September 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Spoken Safety Critical Communications
This document sets out requirements for spoken safety critical communications, including monitoring.
RIS-8046-TOM Iss 1
September 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
GEGN8561 Iss 1
December 2008
Withdrawn
- Briefing Notes: 2
RIS-8046-TOM Iss 2
September 2019
Live
- Briefing Notes: 1
- Impact Assessments 1
Approval of Changes to Axle Bearing Lubricants
This document gives guidance on applying the requirements of RIS-2700-RST when making changes to axle bearing greases that have been approved and…
Resistance of Railway Vehicles to Roll-Over in Gales
This document mandates requirements to be applied to railway vehicles so that they can operate under gale conditions in Great Britain. It applies to…
GMRT2142 Iss 4
June 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Guidance Note on the Provision of Lineside Telephones
This document provides guidance to Infrastructure Managers on criteria that may be considered when deciding on the provision of lineside telephones…
GOGN3677 Iss 1
June 2019
Withdrawn
- Briefing Notes: 1
Infrastructure Based Train Detection Systems
This document sets out requirements and guidance on infrastructure based train detection systems.
RIS-0728-CCS Iss 1
June 2019
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Temporary speed restriction directional arrows
This document provides design details for AF05 sign - Temporary speed restriction directional arrows.
Temporary speed restriction spate indicator
This document provides design details for AF07 sign - Temporary speed restriction spate indicator.
Possession limit board
This document provides design details for AG01 sign - Possession limit board.
Worksite exit marker
This document provides design details for AG03 sign - Worksite exit marker.
Open level crossing combined speed restriction / whistleboard
This document provides design details for AH02m sign - Open level crossing combined speed restriction / whistleboard.
Automatic level crossing wrong direction speed restriction board
This document provides design details for AH04m sign - Automatic level crossing wrong direction speed restriction board.
Signal reminder board
This document provides design details for AK101 sign - Signal reminder board.
Line identification board
This document provides design details for AK103 sign - Line identification board.
Neutral section warning board
This document provides design details for AJ01 sign - Neutral section warning board.
Kilometre Posts
This document provides design details for AK201k sign - Kilometre posts.
Document Type
Issue Date
From: To:Misuse of MEWPs
This poster is provided by the M&EE Networking Group to remind industry not to misuse MEWPs during work activities.
Plant Exclusion Zones
This poster is provided by the M&EE Networking Group to remind industry about the necessity to keep personnel clear from areas around working…
Emergency Haulage by OTMs
This Code of Practice details the haulage capabilities of on-track machines (OTM). It should be followed by any route or operator control when…
Use and Maintenance of Full Electric/Hybrid Powered OTP
This Code of Practice details best practice for use and maintenance of battery or hybrid powered OTP. It defines best practice and industry guidance…
Injection Injury
This poster details the actions to be taken following a hydraulic injection injury.
Cross Tracking of On Track Plant
OTP must only be on/off tracked within a Possession. OTP is not permitted to cross track under Line Blocks.
AFFF Fire Extinguishers
This poster is provided by the M&EE Networking Group to remind industry about the potential for AFFF fire extinguishers to freeze in cold weather.…
RRV Braking
This poster is provided by the M&EE Networking Group to remind industry is a reminder that road-rail vehicles when in rail mode take a lot longer to…
Piling using OTP
This Code of Practice details guidance on the arrangements for controlling the risks when planning and undertaking piling operations on the railway…
Plant Activities with Any Line Open
All plant activities that could foreseeably foul an open line require a documented ALO Plan, which must be approved by a Responsible ALO Manager.