Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Overrun Risk Evaluation and Assessment
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Provisional SPAD Data Collection Form (Railway Undertaking)
Infrastructure managers and railway undertakings shall use the GORT3119 designated Provisional SPAD Data Collection forms when investigating signals…
Form RT3119-B Iss 8
December 2021
Withdrawn
Supplier Assurance
This document is a standard for the generation of supplier assurance during the procurement cycle for products and services, for use in the GB rail…
RIS-2750-RST Iss 1
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Data Recorders on Trains
This document sets out engineering requirements and guidance for the provision and functionality of data recorders on trains.
RIS-2472-RST Iss 1
December 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Format for Infrastructure Gauging Data
This document sets out requirements for the format of infrastructure data for the purposes of gauging compatibility assessment.
Vehicle Fire Safety
This document sets out National Technical Rules for the design of rail vehicles for fire safety.
Vehicle Fire Safety and Evacuation
This document sets out requirements and guidance for rail vehicle fire safety arrangements, including vehicle design, maintenance and servicing, and…
RIS-2730-RST Iss 1
September 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Verification of Conformity of Engineering Change to Rail Vehicles
This Rail Industry Standard sets out a process which can be adopted by organisations that are undertaking projects that require verification of…
RIS-2700-RST Iss 1
September 2021
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
MEWP Planning
This poster is provided by the M&EE Networking Group to remind industry that all MEWP activities must be properly planned and site specific - even if…
Code of Practice for Route Conductor Assurance
This Code of Practice is to assist Duty Holders to identify, assess and control risks which may arise from the activities of supplying and engaging in…
OTP Tandem Lifting and Indication
This poster is provided by the M&EE Networking Group to remind planners to use the latest planning information/tools provided by the RCI suppliers for…
Lifting Accessories Misuse
This poster is provided by the M&EE Networking Group to remind planners and users of plant about the dangers associated with the misuse of lifting…
Lift and Carry Using OTP In Road Mode
This poster is provided by the M&EE Networking Group to remind the operator of road-rail excavator cranes of the need for caution because lift and…
RCI Motion Cut
This poster is provided by the M&EE Networking Group to remind the industry that the RCI function automatically stops further movement of the machine…
Crane Controller Competence for Twin Jib Cranes
This poster is provided by the M&EE Networking Group to remind industry that when using a twin jib crane under the control of one operator then there…
Using Outriggers / Stabilisers on Plant
This poster is provided by the M&EE Networking Group to reminder planners and users of plant with outriggers that stability can be seriously affected…