Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Route Level Assessment of Technical Compatibility between Vehicles and Infrastructure
This document sets out requirements and responsibilities for the assessment of technical compatibility at route level for vehicles and infrastructure.
RIS-8270-RST Iss 1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Passenger Train Dispatch and Platform Safety Measures
This document sets out requirements and guidance for the development, review and implementation of passenger train dispatch processes and measures to…
RIS-3703-TOM Iss 4.1
September 2022
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Trespass Risk Assessment
This document provides a common framework for trespass risk assessments, developed from the outputs of RSSB research project T1183 - Good practice…
Defective On-Train Equipment
This document sets out requirements to be applied when on-train equipment becomes defective and provides guidance to assist the railway undertakings…
RIS-3437-TOM Iss 2
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Client Safety Assurance of High Integrity Software-Based Systems for Railway Applications
This document sets out requirements for safety assurance of high integrity software-based systems for railway applications.
GEGN8650 Iss 1
September 2022
Withdrawn
- Briefing Notes: 1
Lettered Differential Permissible Speeds Classification
This document sets out requirements and guidance for the classification of rail vehicles to the lettered differential permissible speed categories.
RIS-2711-RST Iss 1
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Interface between Station Platforms, Track, Trains and Buffer Stops
RIS-7016-INS brings together requirements to provide an integrated and consistent set covering station platforms, the interface between platforms,…
RIS-7016-INS Iss 1.2
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-7700-INS Iss 3
June 2018
Live
- Briefing Notes: 1
- Impact Assessments 1
Assessment of Compatibility of Rolling Stock and Infrastructure - Gauging and Stepping Distances
This document sets out requirements and responsibilities for the assessment of gauging compatibility and of stepping distances between rolling stock…
GERT8273 Iss 1
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
RIS-7016-INS Iss 1.2
June 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Storage and Recommissioning of Rail Vehicles
This document sets out guidance on the storage and recommissioning of rail vehicles that are not to be operated on the GB mainline railway for an…
GMGN2571 Iss 1
June 2022
Withdrawn
- Briefing Notes: 1
GB Requirements for Platform Height, Platform Offset and Platform Width
GIRT7020 Issue 2 sets out GB requirements in scope of National Technical Rules for platform height, platform offset and platform width.
GIRT7020 Iss 1.1
September 2022
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).
Document Type
Issue Date
From: To:Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Action following Hydraulic Pump and/or Motor Failure
This Code of Practice details the details the action to be taken following the failure of an hydraulic pump and/or motor on an on-track machine (OTM).
COP0039 Iss 1
March 2024
Withdrawn
Code of Practice for Management of Siding Safety Surveys
This Code of Practiceprovides guidance to enable the effective setting up of a safe system of work within all sidings allocated for stabling and…
Seasonal Operating of OTP
This poster is provided by the M&EE Networking Group to remind operators when adhesion is low, keep it slow.
Code of Practice for Route Knowledge within Possessions
This Code of Practice contains guidance and generic good practice for the management of route knowledge for train drivers within a possession. It sets…
OTP Mechanical Movement Limiting Device
This poster is provided by the M&EE Networking Group to remind the industry about the use of mechanical movement limiting device and the restrictions…
Rail Handling – Rail Turner Awareness
This poster is provided by the M&EE Networking Group to remind industry about the competence requirements necessary for the Crane Controller and…
Code of Practice for Brake Testing of OTP
This Code of Practice details the testing of the braking system of OTP excluding Trolleys during operations and routine maintenance examination…
Code of Practice for Loading of OTP
This Code of Practice gives guidance on the arrangements for loading and securing of typical loads associated with all on-track plant (OTP) whilst on…