Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Re-railing Kirow Cranes using Outriggers
This Code of Practice provides guidance in the re-railing of Kirow cranes utilising the crane’s outriggers.
Manually propelled equipment in a line blockage
This poster is provided by the M&EE Networking Group to remind industry of the additional measures to take to use manually propelled equipment in a…
Code of Practice for Safe Use of Remote Controls
This Code of Practice identifies the safe use of wired and wireless remote controls for OTP, OTM and other machines in the railway environment. The…
Code of Practice for Haulage Capabilities of On Track Machines
This Code of Practice details the haulage capabilities of on track machines (OTM), it should be followed by any route or operator control when…
Code of Practice for M&EE Documents
This Code of Practice details the process by which the M&EE Networking Group produces documentation and is intended for internal use of the M&EE…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Switches and Crossings
This document sets out requirements and guidance for new, renewed, and upgraded switches and crossings (S&C) to provide for identification and safe…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
Guidance on the Application of the Control of Electromagnetic Fields at Work Regulations
This document gives guidance on the application of the Control of Electromagnetic Fields at Work Regulations in the railway environment, and…
GLGN1620 Iss 1
March 2024
Withdrawn
- Briefing Notes: 1
On-Train Camera Monitoring Systems
This document sets out requirements for the installation and use of modern camera systems for the purposes of recording, storing, and accessing video…
RIS-2712-RST Iss 1.1
March 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Infrastructure Based Train Detection Interface Requirements
This standard specifies the infrastructure based train detection system parameters that are necessary to support technical compatibility with GB…
GKRT0028 Iss 3.1
March 2024
Withdrawn
- Briefing Notes: 1
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Switches and Crossings
This document sets out requirements and guidance for new, renewed, and upgraded switches and crossings (S&C) to provide for identification and safe…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Operational Requirements for GSM-R Radio
This document contains the necessary requirements and guidance for the development of contingency plans to manage failures of the GSM-R voice system.…
RIS-3780-TOM Iss 1
September 2023
Withdrawn
- Impact Assessments 1
Track to Train RFID Compatibility
This document sets out requirements for RFID compatibility between train and track, including management of application codes.
Signalling layout and signal aspect sequence requirements
This document sets out requirements for the lineside signalling system to be compatible with train operations and guidance on their application.
RIS-0703-CCS Iss 1.1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
- Amendments: 1
- Deviations 1
Engineering Requirements for Steam Locomotives and other Heritage Rail Vehicles
This document sets out the engineering requirements for heritage rail vehicles (including steam locomotives) to support use when operating in heritage…
RIS-4472-RST Iss 1
September 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Changes to National Operations Publications for March 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Driver’s Single Line Working Ticket
This form should be used by the driver when single line working applies.
Rule Book Briefing Leaflet
Each issue of the Rule Book Briefing Leaflet contains a summary of the changes being introduced to GERT8000.
Possession of a running line for engineering work
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 Iss 11
December 2023
Withdrawn
- Impact Assessments 1
- Deviations 7
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-possessionworkers Iss 9
December 2023
Withdrawn
- Impact Assessments 3
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13
December 2023
Withdrawn
- Impact Assessments 3
Rule Book Module Issue History
This document contains updates to align with changes to Rule Book module issues (GERT8000).
ETCS identification plate
This document provides design details for AC11 sign - ETCS identification plate.
Train class specific no entry
This document provides design details for AK207 sign - Train class specific no entry.
Temporary speed restriction spate indicator
This document provides design details for AF07 sign - Temporary speed restriction spate indicator.
Miscellaneous instructions to train crew
This document provides design details for AK209 sign - Miscellaneous instructions to train crew.
Emergency indicator
This document provides design details for AF01 sign - Emergency indicator.
Possession limit board
This document provides design details for AG01 sign - Possession limit board.
Sandite markers
This document provides design details for AK211 sign - Sandite markers.
Bridge identity plates
This document provides design details for AK213 sign - Bridge identity plates.
Worksite exit marker
This document provides design details for AG03 sign - Worksite exit marker.
Temporary speed restriction warning boards (mph)
This document provides design details for AF02m sign - Temporary speed restriction warning boards (mph).
Document Type
Issue Date
From: To:Code of Practice Planning for the Use of Mobile Operated Plant
This Code of Practice details minimum requirements for planning for the use of mobile operated plant excluding lifting operations. It applies to…
COP0002 Iss 12
September 2023
Withdrawn
Reporting track defects
This poster is provided by the M&EE Networking Group to remind industry that any track defects which could affect plant and equipment safely…
Points run through
This poster is provided by the M&EE Networking Group to remind industry that points run throughs only occur when the rules are not followed.
Code of Practice for Loading of OTP
This Code of Practice gives guidance on the arrangements for loading and securing of typical loads associated with all on-track plant (OTP) whilst on…
Use of Mobile Devices
This poster is provided by the M&EE Networking Group to remind industry of the risks posed by using a mobile phone whilst driving a train. Further…
Code of Practice for Defective OTP Safety Critical Equipment
This Code of Practice details what actions should be undertake when On-Track Plant (OTP) is discovered to have defective safety critical equipment…
Code of Practice for Control of Mobile Communication Equipment use in Driving Cabs
This Code of Practice contains requirements and guidance for the control of mobile communication equipment use in the driving cabs of trains. It sets…
COP0129 Iss 1
June 2023
Withdrawn
Code of Practice for OTM Route Conducting Policy
This Code of Practice contains requirements and guidance for OTM driver’s route conducting or being conducted. Also to assist in the improvement of…
Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
MEWP Planning
This poster is provided by the M&EE Networking Group to remind industry that all MEWP activities must be properly planned and site specific - even if…