Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
Level crossings - drivers' instructions
You will need this module if you carry out the duties of a driver.
GERT8000-TW8 Iss 9.1
November 2022
Live Pending Withdrawal
- Impact Assessments 1
Wrong-direction movements
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-TW7 Iss 9
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 4
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13.1
November 2023
Live Pending Withdrawal
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trackworkers Iss 12
September 2023
Live Pending Withdrawal
- Impact Assessments 3
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trainoperationsstaff Iss 13
September 2023
Live Pending Withdrawal
- Impact Assessments 3
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Commencement of special AWS working
This document provides design details for AA03 sign - Commencement of special AWS.
Termination of special AWS working
This document provides design details for AA04 sign - Termination of special AWS working.
Permanently installed AWS cancelling indicator
This document provides design details for AA05 sign - Permanently installed AWS cancelling indicator
Warning of the start of cab-signalling
This document provides design details for AB01 sign - Warning of the start of cab-signalling.
Indication of start of cab-signalling
This document provides design details for AB02 sign - Indication of start of cab-signalling.
Indication of end of cab-signalling
This document provides design details for AB03 sign - Indication of end of cab-signalling.
TVM block marker
This document provides design details for AB04 sign - TVM block marker.
Cab signalling shunt entry board
This document provides design details for AB05 sign - Cab signalling shunt entry board.
Radio electronic token block: loop clear marker
This document provides design details for AB06 sign - Radio electronic token block: loop clear marker.
Start / end of cab signalling directional arrows
This document provides design details for AB07 sign - Start / end of cab signalling directional arrows.
Document Type
Issue Date
From: To:Use of Mobile Devices
This poster is provided by the M&EE Networking Group to remind industry of the risks posed by using a mobile phone whilst driving a train. Further…
Code of Practice for Defective OTP Safety Critical Equipment
This Code of Practice details what actions should be undertake when On-Track Plant (OTP) is discovered to have defective safety critical equipment…
Inspection of Demountable MEWP and Lifting Equipment
This Code of Practice details the arrangements for inspecting MEWPs and lifting equipment in accordance with legislation when attaching to the base…
MEWP Planning
This poster is provided by the M&EE Networking Group to remind industry that all MEWP activities must be properly planned and site specific - even if…
Code of Practice for Route Conductor Assurance
This Code of Practice is to assist Duty Holders to identify, assess and control risks which may arise from the activities of supplying and engaging in…
OTP Tandem Lifting and Indication
This poster is provided by the M&EE Networking Group to remind planners to use the latest planning information/tools provided by the RCI suppliers for…
Lifting Accessories Misuse
This poster is provided by the M&EE Networking Group to remind planners and users of plant about the dangers associated with the misuse of lifting…
Lift and Carry Using OTP In Road Mode
This poster is provided by the M&EE Networking Group to remind the operator of road-rail excavator cranes of the need for caution because lift and…
RCI Motion Cut
This poster is provided by the M&EE Networking Group to remind the industry that the RCI function automatically stops further movement of the machine…
Using Outriggers / Stabilisers on Plant
This poster is provided by the M&EE Networking Group to reminder planners and users of plant with outriggers that stability can be seriously affected…