Adhesion Management System Developments 2008

Last updated on 16 December 2014 1:45
The main line version of Metronet Rail BCV’s Adhesion Controller’s Condition Assessment Tool (the MLACCAT) was used in an operational environment at the Chiltern Railways Control at Banbury during autumn 2008. Operation of the system was under the control of the Adhesion Working Group. Comparisons of the MLACCAT outputs were...
Author(s): W. Poole
Organisation(s): Delta Rail ;
2009
United Kingdom
Join or log in to continue