Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Guidance on wagon maintenance related to recommendations from RAIB reports
This technical note documents findings from all reports, bulletins, and safety digests, published by RAIB, where maintenance of rail wagons has been…
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13.1
November 2023
Live Pending Withdrawal
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trackworkers Iss 12
September 2023
Live Pending Withdrawal
- Impact Assessments 3
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trainoperationsstaff Iss 13
September 2023
Live Pending Withdrawal
- Impact Assessments 3
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Guidance on wagon maintenance related to recommendations from RAIB reports
This technical note documents findings from all reports, bulletins, and safety digests, published by RAIB, where maintenance of rail wagons has been…
Guidance on Operational Railway Safety Awareness
This document is aimed at Railway Undertakings and any other railway actors operating in or around the railway environment. It gives guidance on…
GOGN3616 Iss 1
October 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
Rail Traffic Loading Requirements for the Design of Railway Structures
GCGN5612 gives guidance on the background and application of the rail traffic loading requirements for the design of railway structures set out in BS…
GCGN5612 Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Vehicle Registration, Marking and Numbering
This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline network.
RIS-2453-RST Iss 2.1
September 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Operation of Route- and Line-Proving Trains
This standard sets out a framework to identify the need for, plan, and operate trains for the purposes of route proving on routes that have previously…
Signing of Temporary and Emergency Speed Restrictions
This document sets out requirements, rationale and guidance for signing of Temporary Speed Restrictions (TSRs) and Emergency Speed Restrictions (ESRs)…
RIS-0735-CCS Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Signing of Permissible Speeds
This document sets out requirements, rationale and guidance for signing of permissible speeds applicable to trains operated on the Great Britain (GB)…
RIS-0734-CCS Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Rolling Stock Electromagnetic Compatibility with Trackside CCS Subsystems
This document gives guidance on achieving rolling stock electromagnetic compatibility with control, command and signalling (CCS) subsystems, through…
Lineside Operational Signs
This document sets out requirements, rationale and guidance for the application of lineside operational signs published in the RSSB catalogue. It also…
RIS-0733-CCS Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Entering and leaving a GSM-R radio zone marker
This document provides design details for DC01 sign - Entering and leaving a GSM-R radio zone marker.
Combined End of GSM-R and National Radio Network Channel Change Marker
This document provides design details for DC05 sign - Combined end of GSM-R and national radio network channel change marker.
GSM-R signal box phone number short code
This document provides design details for DD03 sign - GSM-R signal box phone number short code.
Signal post telephone - limited clearance label
This document provides design details for DB02 sign - Signal post telephone - limited clearance label.
Temporary speed restriction AWS cancelling indicator
This document provides design details for AF08 sign - Temporary speed restriction AWS cancelling indicator.
Level crossing warning sign
This document provides design details for AH01 sign - Level crossing warning sign.
Level crossing sighting board
This document provides design details for AH05 sign - Level crossing sighting board.
Warning of traction system changeover
This document provides design details for AJ04 sign - Warning of traction system changeover.
Countdown markers
This document provides design details for AK102 sign - Countdown markers.
Mile Posts
This document provides design details for AK201m sign - Mile posts.
Document Type
Issue Date
From: To:Code of Practice for Audit Protocol for Supply of Machine / Crane Controllers
This Audit Protocol provides a comprehensive list of questions for an auditor to ask and detailed guidance of what is expected of an auditor whilst…