Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:AC Energy Subsystem and Interfaces to Rolling Stock Subsystem
This document sets out requirements for the alternating current (ac) energy subsystem and the interfaces to rolling stock operating over the ac…
GLRT1210 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 52
GLGN1610 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Rolling Stock Subsystem and Interfaces to AC Energy Subsystem
This document sets out interface requirements to the alternating current (ac) energy subsystem for all rolling stock operating over the Great Britain…
GMRT2111 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
GMGN2611 Iss 2
March 2023
Withdrawn
- Briefing Notes: 1
- Impact Assessments 2
Train front-end visibility requirements and safe integration
This technical note clarifies the application of standards and legislation for front-end visibility and safe integration of rolling stock within the…
Electric token block regulations
You will need this module if you carry out the duties of a signaller in an electric token block area.
Tokenless block regulations
You will need this module if you carry out the duties of a signaller in a tokenless block area.
No-signaller token regulations
You will need this module if you carry out the duties of a signaller in a no-signaller token area. You will also need module TS8 One-train working…
One-train working regulations
You will need this module if you carry out the duties of a signaller in a one-train working area, whether or not a train staff is provided, and a…
Possession of an ERTMS running line for engineering work where lineside signals are not provided
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-T3 ERTMS Iss 4
December 2022
Withdrawn
- Impact Assessments 1
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Weekly Operating Notice, Periodical Operating Notice and the Sectional Appendix
This document sets out the arrangements for the production of information relating to engineering work, alterations to track and signalling…
GORT3215 Iss 3
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Guidance on the Application of the Control Command and Signalling TSI
This guidance note has been produced to provide application guidance on the CCS TSI. The CCS TSI was adopted by Commission Regulation (EU) 2016/919/EC…
Information for Safe Train Operation
This document sets out requirements for information to be provided by the railway undertaking to the infrastructure manager regarding train running on…
GORT3436 Iss 3
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
Positioning of Lineside Telephones
This document sets out the requirements for assessing the positioning of lineside operational telephones and the provision of information labels.
GERT8048 Iss 2
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 2
- Amendments: 1
GEGN8648 Iss 1
March 2017
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
- Amendments: 1
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trainoperationsstaff Iss 14.1
November 2024
Live Pending Withdrawal
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 14.1
November 2024
Live Pending Withdrawal
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signals, Handsignals, Indicators and Signs Handbook
You will need this handbook if you need to understand the meaning of signals, handsignals, indicators and signs.
RS521 Iss 7
September 2024
Live Pending Withdrawal
- Impact Assessments 2
- Deviations 2
AC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper or person…
DC Electrified Lines
This handbook is for those personnel who need to go on the operational railway in an DC electrified area to carry out their duties, with the exception…
DC Electrified Lines
You will need this module if you carry out the duties of a train driver, guard, shunter, designated person (DP), signaller, crossing keeper in DC…
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).