Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Evidence conservation of failed axle bearings in service
This technical note sets out a methodical approach to collecting data at the point of failure and preserving the failed bearings for further analysis…
Level crossings - drivers' instructions
You will need this module if you carry out the duties of a driver.
GERT8000-TW8 Iss 9.1
November 2022
Live Pending Withdrawal
- Impact Assessments 1
Wrong-direction movements
You will need this module if you carry out the duties of a driver or signaller.
GERT8000-TW7 Iss 9
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 4
Master manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Possession Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Signaller and Signalling Technician Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-signallersignallingtechnician Iss 13.1
November 2023
Live Pending Withdrawal
Train Driver Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Track Workers Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trackworkers Iss 12
September 2023
Live Pending Withdrawal
- Impact Assessments 3
Train Operations Staff Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
GERM8000-trainoperationsstaff Iss 13
September 2023
Live Pending Withdrawal
- Impact Assessments 3
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Lineside Signal and Indicator Product Design and Assessment Requirements
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
GKRT0057 Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Public address interface to GSM-R
This technical note will help industry to determine GSM-R cab radio public address announcement priorities when integrated with the onboard public…
Fire safety of refurbished passenger seats
This technical note provides guidance on the application of fire standards to existing vehicles undergoing refurbishment which affects passenger…
Guidance on the Application of the Control of Electromagnetic Fields at Work Regulations
This document gives guidance on the application of the Control of Electromagnetic Fields at Work Regulations in the railway environment, and…
GLGN1620 Iss 1
March 2024
Withdrawn
- Briefing Notes: 1
On-Track Plant, Trolleys and Associated Equipment
This document sets out requirements and guidance for engineering of on-track plant, trolleys and associated equipment.
RIS-1530-PLT Iss 7
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Technical Notes 1
On-Train Camera Monitoring Systems
This document sets out requirements for the installation and use of modern camera systems for the purposes of recording, storing, and accessing video…
RIS-2712-RST Iss 1.1
March 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Infrastructure Based Train Detection Interface Requirements
This standard specifies the infrastructure based train detection system parameters that are necessary to support technical compatibility with GB…
GKRT0028 Iss 3.1
March 2024
Withdrawn
- Briefing Notes: 1
Compliance with noise and vibration legislation
This technical note sets out the relevant railway-specific legislation on noise and vibration. It will help familiarise organisations with their…
Track System Requirements
This document sets out Great Britain (GB) requirements in scope of the national technical rules for track geometry, track systems and track components…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Switches and Crossings
This document sets out requirements and guidance for new, renewed, and upgraded switches and crossings (S&C) to provide for identification and safe…
GCRT5021 Iss 5
March 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 2
- Deviations 8
Working of on-track machines (OTM)
You will need this module if you carry out the duties of a driver of an on-track machine, an operator of an on-track machine or a signaller.
GERT8000-OTM Iss 11
September 2023
Live Pending Withdrawal
- Impact Assessments 1
Changes to National Operations Publications for September 2024
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Failure of, or work on, signalling equipment - signallers' regulations
You will need this module if you carry out the duties of a signaller.
GERT8000-TS11 Iss 6
September 2023
Live Pending Withdrawal
- Impact Assessments 1
Duties of the engineering supervisor (ES) in a possession
You will need this handbook if you carry out the duties of the ES in a possession.
GERT8000-HB12 Iss 9
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 15
Duties of the person in charge of the possession (PICOP)
You will need this handbook if you carry out the duties of the PICOP.
GERT8000-HB11 Iss 10
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 13
General signalling regulations
You will need this module if you carry out the duties of a signaller.
GERT8000-TS1 Iss 17
September 2023
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 2
General duties and track safety for track workers
This handbook is for those personnel who need to go on the operational railway to carry out their duties, with the exception of a train driver, guard,…
GERT8000-HB1 Iss 7
September 2021
Live Pending Withdrawal
- Impact Assessments 1
IWA, COSS or PC blocking a line
You will need this handbook if you carry out the duties of a IWA, COSS or PC blocking a line.
GERT8000-HB8 Iss 9
September 2022
Live Pending Withdrawal
- Impact Assessments 1
- Deviations 1
Level crossings - signallers' regulations
You will need this module if you carry out the duties of a signaller in an area where there is a level crossing.
GERT8000-TS9 Iss 4.1
November 2022
Live Pending Withdrawal
- Impact Assessments 1
Ground position light signal identification plate
This document provides design details for AC09 sign - Ground position light signal identification plate.
ETCS identification plate
This document provides design details for AC11 sign - ETCS identification plate.
GSM-R alias plate
This document provides design details for AC12 sign - GSM-R alias plate.
Permissible speed indicators (km/h)
This document provides design details for AD01k sign - Permissible speed indicators (km/h).
Permissible speed indicators (mph)
This document provides design details for AD01m sign - Permissible speed indicators (mph).
Permissible speed indicators (km/h) for limited clearance
This document provides design details for AD02k sign - Permissible speed indicators (km/h) for limited clearance.
Termination of AWS gap
This document provides design details for AA02 sign - Termination of AWS gap.
Commencement of AWS gap
This document provides design details for AA01 sign - Commencement of AWS gap.
Document Type
Issue Date
From: To:Code of Practice for Plant Any Line Open (ALO) Working
This Code of Practice provides guidance on how to safely manage Plant Any Line Open (ALO) working.
Code of Practice for Hydraulic Hose In-use Repair
This Code of Practice details the action to be taken following the failure of hydraulic hose(s) on an on-track machine (OTM).
Code of Practice for Safe use of Quick Hitches
This Code of Practice identifies the types of quick hitches as categorised by the HSE and details the safety issues and provides safe systems of work…
Code of Practice for OTM Ready to Run Card
This Code of Practice provides guidance on the action to be taken and design of card to show that an applicable on-track machine (OTM) is ready to be…
Code of Practice for Management of Siding Safety Surveys
This Code of Practiceprovides guidance to enable the effective setting up of a safe system of work within all sidings allocated for stabling and…
Seasonal Operating of OTP
This poster is provided by the M&EE Networking Group to remind operators when adhesion is low, keep it slow.
OTP Mechanical Movement Limiting Device
This poster is provided by the M&EE Networking Group to remind the industry about the use of mechanical movement limiting device and the restrictions…
Code of Practice for Route Knowledge within Possessions
This Code of Practice contains guidance and generic good practice for the management of route knowledge for train drivers within a possession. It sets…
Rail Handling – Rail Turner Awareness
This poster is provided by the M&EE Networking Group to remind industry about the competence requirements necessary for the Crane Controller and…
Code of Practice for Brake Testing of OTP
This Code of Practice details the testing of the braking system of OTP excluding Trolleys during operations and routine maintenance examination…