Standards Catalogue
Welcome to the standards catalogue. Search by entering a title, keyword(s) or document number below (e.g. "platform" or 7016 or GERT8000-TW1) or use the filters to narrow down all options. Boolean search operators such as AND, OR, (-) minus sign and ("") quotes for exact match may also be used.
Lead/Supporting Committee(s)
Issue Date
From: To:Application of Standard Vehicle Gauges
This document defines standard vehicle gauges and the associated application rules for rolling stock and for infrastructure.
GERT8073 Iss 4.1
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 1
Changes to National Operations Publications for June 2025
This document is primarily used to publish minor changes to National Operations Publications (NOPs) and has been re-issued, taking into consideration…
Application of the Entity in Charge of Maintenance Regulations
This document gives guidance on the application of regulations on entities in charge of maintenance (ECM) with respect to freight wagons that are used…
Verification of Conformity of Engineering Change to Rail Vehicles
The document sets out a process for verification of conformity of engineering change against applicable requirements. This process can be adopted by…
RIS-2700-RST Iss 2
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
- Technical Notes 3
Size of Vehicles and Position of Equipment
This document sets out Great Britain (GB) requirements in scope of National Technical Rules for the methods of determining the swept envelope of rail…
GMRT2173 Iss 4
June 2025
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Deviations 3
Crashworthiness risk assessment for mainline passenger rolling stock
This Technical Note aims to address Recommendation 19 c) of RAIB’s Carmont report. This required RSSB, in consultation with operators of pre-1994…
Onboard passenger air quality improvement
This technical note aims to inform the industry about potential solutions for improving air quality in the passenger cabin environment, referred to in…
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Master Manual
The Rule Book manuals have been produced to provide end-users with access to the content of the Rule Book that is relevant to their roles, e.g.…
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Lead/Supporting Committee(s)
Document Type
Issue Date
From: To:Rolling Stock Electromagnetic Compatibility with Trackside CCS Subsystems
This document gives guidance on achieving rolling stock electromagnetic compatibility with control, command and signalling (CCS) subsystems, through…
Rail Traffic Loading Requirements for the Design of Railway Structures
GCGN5612 gives guidance on the background and application of the rail traffic loading requirements for the design of railway structures set out in BS…
GCGN5612 Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Signing of Permissible Speeds
This document sets out requirements, rationale and guidance for signing of permissible speeds applicable to trains operated on the Great Britain (GB)…
RIS-0734-CCS Iss 2
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Signing of Temporary and Emergency Speed Restrictions
This document sets out requirements, rationale and guidance for signing of Temporary Speed Restrictions (TSRs) and Emergency Speed Restrictions (ESRs)…
RIS-0735-CCS Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
Vehicle Registration, Marking and Numbering
This document sets out requirements for the registration, marking and numbering of rail vehicles operating on the Great Britain (GB) mainline network.
RIS-2453-RST Iss 2.1
September 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Clarification on drugs and Alcohol testing for safety-critical workers
This technical note aims to provide a greater understanding of the importance of drugs and alcohol testing for safety-critical workers by providing…
Managing Low Adhesion
This standard sets out a framework to develop, implement, monitor and review the effectiveness of site-specific plans to manage low adhesion at…
Lineside Signal and Indicator Product Design and Assessment Requirements
This document sets out requirements and guidance for the management of risk associated with trains exceeding the end of their movement authority.
GKRT0057 Iss 1
September 2024
Withdrawn
- Briefing Notes: 1
- Impact Assessments 1
- Amendments: 1
Rail Industry Standard for Driving Cabs
This document sets out supplementary requirements for the design, layout and operational equipment in driving cabs of rail vehicles to the Locomotive…
RIS-2761-RST Iss 1.1
June 2024
Withdrawn
- Briefing Notes: 2
- Impact Assessments 1
Line Blockage Form
This form is used by the Signaller, IWA, COSS, PC and SWL to record the details of a line blockage
Form NR3180 Iss 12-17 Issue 2
December 2018
Withdrawn
- Impact Assessments 1
ERTMS level 2 train signalling regulations
Regulations for train signalling by the European rail traffic management system (ERTMS). You will need this module if you carry out the duties of a…
GERT8000-TS10 ERTMS Iss 3
December 2018
Withdrawn
- Impact Assessments 2
Emergency Special Working Ticket
This form is to be used by the driver and signaller during emergency special working.
Directional arrows
This document provides design details for sign AJ10 - Directional arrows.
Advance lower pantograph (temporary power changeover)
This document provides design details for sign AJ12 - Advance lower pantograph (temporary power changeover).
Warning of Traction System Changeover
This document provides design details for sign AJ04 - Warning of traction system changeover.
Indication of route
This document provides design details for sign AJ11 - Indication of route.
Lower pantograph (temporary power changeover)
This document provides design details for sign AJ13 - Lower pantograph (temporary power changeover).
Changeover to or from self-powered
This document provides design details for sign AJ08 - Changeover to or from self-powered.
Changeover to Overhead Electric Traction
This document provides design details for sign AJ07 - Changeover to Overhead Electric Traction.
Do not raise pantograph
This document provides design details for sign AJ09 - Do not raise pantograph.
Do not raise pantograph (temporary power changeover)
This document provides design details for sign AJ15 – Do not raise pantograph (temporary power changeover).